Skip to content

Pexgol’s Solution in Secondary Recovery for EMESA

EMESA Optimizes Formation Water Transportation in Mendoza.

Case Study Nº

164

Customer

EMESA
Argentina

|

2023

Working Conditions

Temperature: 40° / 104°F | Flow: 100 m³/d | Pressure: 30 kg/cm² | Fluid components: Formation water

Pexgol Pipes

Pexgol 90 mm class 15; 90 mm class 24 & 110 mm class 30

Application

Secondary Recovery

Lenght

700 m / 2296.59 ft

Categories

Pexgol’s Solution in Secondary Recovery for EMESA

The Challenge

EMESA, an energy company in the province of Mendoza (Argentina) that participates in some hydrocarbon projects in the province in collaboration with private operators, faced the need to establish a new line for secondary recovery. The project involved transporting formation water from a well with mechanical pumping (AIB) to a tank, operating at a temperature of 40°C, a flow rate of 100 m³/h, and a pressure of 30 kg/cm².

The Solution

To meet the operational requirements of the project, EMESA decided to implement 90 mm class 15, 90 mm class 24, and 110 mm class 30 Pexgol pipes, covering a total length of 700 meters. Pexgol pipes were selected due to their quick installation, material flexibility, lightness, and ease of handling, as well as their ability to supply long sections that simplify the installation process.

The installation of the Pexgol pipes was efficiently carried out in a single day by unrolling the pipes and using double mechanical connectors and flanged couplings. This process was not only fast but also notable for the minimal time required for the installation of mechanical fittings. Pexgol’s ability to handle high pressures and temperatures,
along with its corrosion resistance, ensured reliable and long-lasting operation.

EMESA’s positive experience with Pexgol underscores the importance of choosing high-quality and resistant materials for critical applications in the energy sector

Related Case Studies

Pexgol Transforms Tailings Transportation at Minera San Julián.

Minera San Julián Adopts Pexgol to Improve Water Management

Fresnillo plc
Mexico

 | 

2024
Транспортировка речной воды по пересеченной местности.

Транспортировка воды по пересеченной местности

Southern Copper Corporation
Перу

 | 

2019
Транспортировка пульпы пальмового масла при 95 °C.

Транспортировка пульпы пальмового масла

Компания Loma Fresca
Колумбия

 | 

2017
Pexgol pipe was selected for the assembly of a muddy water transport line for a palm oil processing company.

Transport of Muddy Water for Palm Oil Extractor

Extractora Poligrow
Colombia

 | 

2022
In an engineering challenge, the Pexgol 225 mm (8”) Class 15 pipe proved to be the perfect solution for transporting tailings at the Mina Capela mining complex.

Environmental Protection and Efficiency in Tailings Management

Mina Capella - Grupo Peñoles
Mexico

 | 

2023
Pexgol pipe was selected for the Assembly of a Muddy Water Transport Line for a Palm Oil Processing Company.

Efficient Choice: PE-X Pipe for the Palm Industry

Extractora Monterrey
Colombia

 | 

2023