Fiber Optic Cables Through a Vertical Shaft

Installation of Pexgol Pipe to Transport Fiber Optic Cables.

Case Study Nº

99

Customer

Sinohydro
Israel

|

2021

Working Conditions

500 meters hanging without supports inside service shaft

Pexgol Pipes

Pexgol 50 mm (2”) Class 15 | Pexgol 63 mm (2”) Class 15

Application

Fiber Optic Cables Transport

Lenght

Pexgol 50 mm: 14,050 m / 46,095 ft | Pexgol 63 mm: 9,100 m / 29,855 ft

Categories

The Challenge

Sinohydro, a Chinese state-owned hydropower engineering and construction company, wanted to install fiber optic cables through a vertical shaft 500 meters deep. They needed conduit pipes that would withstand the tensile forces of the pipe weight. The pipes have to be embedded in concrete, so they have to resist the temperature of the concrete during casting.

Pexgol Solution

Pexgol was chosen due to their ability to withstand high tensile forces and high temperatures.The 63 mm pipe was provided in 13 coils of 700 m each and the 50 mm pipe was provided in 13 coils of 1080 m each.
Only a double mechanical connector was used to hold the pipes above the pit.

Related Case Studies

Транспортировка пульпы пальмового масла при 95 °C.

Транспортировка пульпы пальмового масла

Компания Loma Fresca
Колумбия

 | 

2017
Осушение сквозных шахтных стволов на подземном свинцово-цинковом руднике.

Осушение сквозных шахтных стволов

Esan Eczacibasi Endustriyel Hammaddeler
Турция

 | 

2019
Adapting to the demands of the process: how Pexgol solves the problems of corrosion and abrasion in the extraction of palm oil.

Implementation of Pexgol Pipelines for the Transport of Muddy Water

IACSA
Colombia

 | 

2023
Replacement of HDPE Pipes For Pe-X to Transport Industrial Treated Water.

Industrial Waste Water to MBR Treatment Facility

Chip Manufacturer
Israel

 | 

2021
Installation Oof Pexgol Pipes through a Chimney for Compressed Air.

Transport of Compressed Air for Underground Mine

HMC Gold
Chile

 | 

2021
Транспортировка высококоррозийных материалов от сгустителей на установку нейтрализации

Транспортировка коррозионных материалов

Компания Moa Nickel S.A, Sherritt
Куба

 | 

2015