Skip to content

Biodiesel Transport

Biodiesel Transport through the Colombian Jungle

Case Study Nº

56

Customer

Indupalma (Oro Rojo Plant)
Colombia

|

2012

Working Conditions

Temperature: Fluid at 95°C Pressure: 10 bar

Pexgol Pipes

Pexgol 160 mm (6”), Class 24

Application

Biodiesel Transport

Lenght

450 m

Categories

Biodiesel Transport through the Colombian Jungle

The Challenge

Indupalma is a company that produces palm oil and its derivatives. One of the most common uses of palm oil is for the production of biodiesel. Initially, Indupalma used asbestos pipes for transporting biodiesel, which were later replaced by CPCV SCH 80 pipes. Neither of these materials was resistant to abrasion and the high temperatures of the fluid. Moreover, due to the jungle terrain (where there are constant rains and landslides), these pipes often broke completely due to the movement of rocks and trees. This situation caused losses for the company, not only due to production stoppages and the constant need to replace the pipes, but also because of spills that had environmental consequences.

The Solution

After witnessing the poor performance of these pipe materials, Indupalma decided to look for a new pipe material that could withstand impact, chemical resistance, and high temperatures to transport the fluid. They ultimately chose Pexgol pipes, which met all these requirements.

Related Case Studies

Biodiesel Transport through the Colombian Jungle

Biodiesel Transport

Indupalma (Oro Rojo Plant)
Colombia

 | 

2012
Improving drainage in the Media Luna mine with Pexgol.

Overcoming Geotechnical Challenges with Pexgol at Media Luna

Minera Media Luna
Mexico

 | 

2023
Substitution of a Steel Spool for PE-X Coated for Pumping Formation Water.

Replacement of a Steel Spool with Pexgol

Enap Sipetrol
Ecuador

 | 

2021
A Case Study on the Collaborative Engineering and Strategic Implementation of the Pexgol Pipeline System for Public Safety and Efficiency

Innovation in Safety: Pexgol Piping System for LPG Supply

Rawabi City
Israel

 | 

2010
Транспортировка пульпы бокситовой руды при 95 °C / 203 °F

Алюминиевый завод: Транспортировка рудной пульпы

Уральский алюминиевый завод — «Русал»
Россия

 | 

2013
Transformation in the logistics of formation water.

Aconcagua Energía Implements Pexgol Solutions for Efficiency and Savings

Aconcagua Energía
Argentina

 | 

2023