Biodiesel Transport

Biodiesel Transport through the Colombian Jungle

Case Study Nº

56

Customer

Indupalma (Oro Rojo Plant)
Colombia

|

2012

Working Conditions

Temperature: Fluid at 95°C Pressure: 10 bar

Pexgol Pipes

Pexgol 160 mm (6”), Class 24

Application

Biodiesel Transport

Lenght

450 m

Categories

Biodiesel Transport through the Colombian Jungle

The Challenge

Indupalma is a company that produces palm oil and its derivatives. One of the most common uses of palm oil is for the production of biodiesel. Initially, Indupalma used asbestos pipes for transporting biodiesel, which were later replaced by CPCV SCH 80 pipes. Neither of these materials was resistant to abrasion and the high temperatures of the fluid. Moreover, due to the jungle terrain (where there are constant rains and landslides), these pipes often broke completely due to the movement of rocks and trees. This situation caused losses for the company, not only due to production stoppages and the constant need to replace the pipes, but also because of spills that had environmental consequences.

The Solution

After witnessing the poor performance of these pipe materials, Indupalma decided to look for a new pipe material that could withstand impact, chemical resistance, and high temperatures to transport the fluid. They ultimately chose Pexgol pipes, which met all these requirements.

Related Case Studies

Транспортировка воды c твердой фазой из карьера

Откачка воды из карьера

Компания Doña Inés de Collahuasi SCM, шахта Collahuasi
Чили

 | 

2013
Pexgol’s chemical resistance and flexibility outperform HDPE in demanding leach pad operations.

Greater Efficiency and Safety in Leaching with Pexgol Pipes

Barrick Gold Corp.
Argentina

 | 

2025
Замена трубы ПЭНД на трубу компании Pexgol

Транспортировка суспензии

Шахта Tizapa
Мексика

 | 

2015
Replacement of Steel Pipes with Pexgol for Testing Centrifugal Pumps.

Pexgol for Centrifugal Pump Test

Flowserve
Argentina

 | 

2022
Reducing maintenance and increasing safety in hydraulic backfill operations.

Pexgol Simplifies Slurry Transportation at Buriticá Mine

Zijin - Continental Gold
Colombia

 | 

2023
Installation of Pexgol Pipe to Transport Brine at High Pressure in a Borehole.

Transporting Brine at High Pressure

Mekorot
Israel

 | 

2020