Skip to content

Biodiesel Transport

Biodiesel Transport through the Colombian Jungle

Case Study Nº

56

Customer

Indupalma (Oro Rojo Plant)
Colombia

|

2012

Working Conditions

Temperature: Fluid at 95°C Pressure: 10 bar

Pexgol Pipes

Pexgol 160 mm (6”), Class 24

Application

Biodiesel Transport

Lenght

450 m

Categories

Biodiesel Transport through the Colombian Jungle

The Challenge

Indupalma is a company that produces palm oil and its derivatives. One of the most common uses of palm oil is for the production of biodiesel. Initially, Indupalma used asbestos pipes for transporting biodiesel, which were later replaced by CPCV SCH 80 pipes. Neither of these materials was resistant to abrasion and the high temperatures of the fluid. Moreover, due to the jungle terrain (where there are constant rains and landslides), these pipes often broke completely due to the movement of rocks and trees. This situation caused losses for the company, not only due to production stoppages and the constant need to replace the pipes, but also because of spills that had environmental consequences.

The Solution

After witnessing the poor performance of these pipe materials, Indupalma decided to look for a new pipe material that could withstand impact, chemical resistance, and high temperatures to transport the fluid. They ultimately chose Pexgol pipes, which met all these requirements.

Related Case Studies

Линии подачи пресс-фильтра LASTA2

Транспортировка концентрированной медной руды

Компания BHP Billiton, месторождение, Olympic Dam, Австралия
Австралия

 | 

2014
Сокращение накопления отложений - высококонцентрированный известковый раствор

Технологическая вода — транспортировка рассола

SQM Nueva Victoria Iquique
Чили

 | 

2010
Установка дренажной системы на карьере.

Дренажная система

BHP Pampa Norte — Рудник Серро-Колорадо
Чили

 | 

2020
Отвод воды из шахты

Отвод воды из шахты

Компания El Peñón Yamana Gold, шахта Meridian
Чили

 | 

2016
Вычерпываемый шлам с крупнозернистым NaCl (соль)

Шламовые линии. Абразивныйвыбранный грунт

Группа ICL, работы на Мертвом море
Израиль

 | 

1992
The mine was facing scaling issues with their existing HDPE pipes, which required replacement every two weeks. The introduction of Pexgol pipes drastically reduced scaling.

Pexgol: Significant Pipe Wall Scale Reduction

Copper Mine
USA

 | 

2022