Pexgol’s Solution for CFE: A Leap in Durability and Efficiency

Transforming water transportation with Pexgol technology

Case Study Nº

154

Customer

Comisión Federal de Electricidad
Mexico

|

2023

Working Conditions

Temperature: 30°C / 86°F | Pressure: 8kg

Pexgol Pipes

Pexgol 6″, class 15

Application

Sea water transport

Lenght

150 m / 15748 ft 90° elbows and mechanical flanged joints

Categories

Pexgol’s Solution for CFE: A Leap inDurability and Efficiency

The Challenge

The Federal Electricity Commission (CFE), Mexico’s leading electricity company, at its Empalme (Sonora) facility, faced significant challenges with its existing stainless steel pipelines used for transporting treated seawater. The saline environment and corrosive nature of seawater led to frequent corrosion of the steel pipes, requiring constant shortterm maintenance efforts. Seawater is used for cooling turbines, so any failure in the line can lead to downtime in production. Replacing stainless steel pipes required skilled welders and large cranes to handle the tubes due to their high weight.

The Solution

Pexgol provided a comprehensive solution with its 6” RD11 pipes, specifically designed for challenging conditions like those at CFE. Pexgol pipes, known for their high chemical resistance and corrosion resistance, offered a robust alternative to stainless steel.

Pexgol’s flanged coupling and elbow fittings facilitated a smooth installation process on the existing rack, and the lightweight nature of Pexgol pipes allowed for easier handling and maneuvering during installation. Quickpipes Systems provided on-site
technical support, ensuring a seamless transition to Pexgol pipes. This solution not only accelerated the installation process but also significantly reduced maintenance needs, thanks to Pexgol’s durability and the long pipe lengths that minimized the need
for joints.

Related Case Studies

How Pexgol Accelerated the Supply and Installation of a Critical Line.

Comprehensive Water Transportation Solution for Urgent Projects

Madagascar Mining
Madagascar

 | 

2024
Монтаж сети пожаротушения на нефтеперерабатывающем заводе.

Водоснабжение для пожарных сетей

КНМ
Аргентина

 | 

2021
Pexgol Pipe Installation for Open Pit Mine Drainage.

High Pressure Dewatering in Open Pit Mine

Lundin Mining
Chile

 | 

2021
Dry Gas Line for Pump Activation.

Dry Gas Transportation

ExxonMobil
Argentina

 | 

2020
Монтаж труб Pexgol для дренажа в подземном руднике.

Высоконапорный дренаж в подземном руднике

Рудник Охос-дель-Саладо — Lundin Mining
Чили

 | 

2018
Pexgol helped Profertil to overcome the corrosion challenge in its fire protection network.

From carbon steel to Pexgol: A victory against corrosion

Profertil
Argentina

 | 

2021