Well Drainage at Mining Dam
Installation of a Drainage System between a Well and a Mining Dam.
Estudo de Caso Nº
78
Cliente
|
Condições de Trabalho
Solução Pexgol
Aplicação
Comprimento
Categorias
The Challenge
The administration of the Carén reservoir, in the commune of Alhué (Chile), receives tailings from the El Teniente mine.
The western retaining wall of the reservoir needed to be widened by at least 30 meters. In order to do that a well had to be drained that was formed by leaks from the wall at its base. The extracted water had to be returned to the dam.
Also, the drainage work had to be done in just 20 days.
Pexgol Solution
The customer finally opted for Pexgol, despite the higher cost per meter, because the final cost of the installation, that only took one week, was widely offset against the installation of HDPE pipe that would have taken about a month and a half.
The advantage of Pexgol, in this solution, lies in the supply format in coils of long lengths, which made it possible to streamline its layout in the field, with no more than a dozen couplings, thus reducing assembly time.
In addition to the quick installation, technical assistance from the local team (Crosspipe Systems) was carried out with great agility and efficiency.
A total of 11 electrofusion fittings were installed.
Estudos de Caso Relacionados
Water Supply & Fire Extinguisher Line
|
Water Transport Between Dams
|
Water Drainage at an Open-Cast Mine
|
Open Cast Mine Dewatering
|
Fiber Optic Cables Through a Vertical Shaft
|