Skip to content

Water Drainage in Underground Mine

Drainage in Underground Mine with Slopes Between 40° and 90°.

Estudo de Caso Nº

58

Cliente

NEMISA Mine
Mexico

|

2018

Condições de Trabalho

Pressure between 15 and 30 bar, temperature at 40°C

Solução Pexgol

Pexgol 120 mm (4”), Class 15, 24 & 30

Aplicação

Underground Mine Dewatering

Comprimento

4430 m

Categorias

Drainage in Underground Mine with Slopes Between 40° and 90°.

The Challenge

At NEMISA underground mine, groundwater levels were rising, interrupting production and avoiding continuity and exploration in the mine.

Taking into account the complex topography and depth of the mine, where the water was at 700 meters depth, a pumping system which could work at high pressures to move the water through pools at different mine levels. The slopes inside the mine ranged between 40° and 90°.
The challenge was to find a pipe with high pressure resistance as well as high flexibility, since the pipes had to cross cesspits. The NEMISA engineering team evaluated different options for the pipe material:

  • Steel: was not suitable since it is not flexible, expensive to install and suffers easily from corrosion.
  • HDPE: was not suitable since it doesn’t withstand high pressure and installation would have been complicated.
  • PE-X: was chosen due to its high pressure resistance, its simple and fast installation, and its availability in pipe sections of 1200 meters.

Pexgol Solution

After choosing the PE-X for the drainage line, Pexgol supplied 4400 meters of coiled pipe. Part of the coils were deployed inside the mine through cesspits. The other part was deployed outside the mine, and the pipes were dragged by a truck hundreds of meters to the point of installation.
The installation required very few connections, and the operators of the plant were very satisfied with the speed and ease of installation of the Pexgol system. The connections were made with flanged couplings and did not require special tools.

It was not necessary to install any kind of pipe supports, the mine ramps were used as existing supports.

NEMISA was very satisfied and decided to continue using Pexgol for other dewatering applications.

Estudos de Caso Relacionados

Replacement of Steel Pipes with Pexgol for Testing Centrifugal Pumps.

Pexgol for Centrifugal Pump Test

Flowserve
Argentina

 | 

2022
Replacing Steel for PE-X Pipes to Transported Processed Water.

Replacement of Steel Pipes for PE-X

Rosebel Gold Mines – IamGold
Suriname

 | 

2020
Installation of a Pexgol Elbow with Mechanical Joints to Replace HDPE.

Pexgol Elbow for Slurry Transport

Antioquia Gold
Colombia

 | 

2022
Installation of a New Pexgol Pipeline to Provide Hot Water for a Electro-Thermal Storage System.

Hot Water Distribution for Solar Technology

Raygen
Australia

 | 

2021
Transportation of brackish water to the main pumping station

Water Lines – Harsh Conditions

Dead Sea Works
Israel

 | 

1993
Vertical Mobile Pexgol Installation on the Rocks for Mine Dewatering.

Mine Dewatering at Low Temperature

Ferrexpo Yeristovo Mining
Ukraine

 | 

2019