Skip to content

Water and Sulfide Transportation

Water transportation with sulfide and cobalt particles

Estudo de Caso Nº

22

Cliente

Moa Nickel S.A. Sherritt
Cuba

|

2015

Condições de Trabalho

110°C – 1 bar.

Solução Pexgol

Pexgol 250 mm Class 12.

Aplicação

Water transportation.

Comprimento

40 m.

Categorias

Water and Sulfide Transportation

The Challenge

Moa Nickel transported water with nickel sulfide particles, this liquid formed a paste that was incrusted on the pipe walls and elbows, reducing it inside diameter. In order to repair the issue, they needed to stop the production plant, which required long maintenance time and as a consequence it decreased their productive capabilities.

Pexgol Solution

The former stainless steel pipe was replaced for a Pexgol pipe 250 mm, class 12. Even though the pipe had low thickness, it didn’t have problems such as wear nor incrustations. Likewise, due to its low roughness coefficient is lower than the titanium pipes, the head losses decreased and the pipe managed to work in a lower pressure with a greater flow.

Since the installation, the client didn’t spend on maintenance.

Estudos de Caso Relacionados

Transportation of water with solids from an open cast mine

Open Cast Mine Dewatering

Doña Inés de Collahuasi SCM, Collahuasi Mine
Chile

 | 

2013
Installation of Pexgol Pipes for Drainage of an Underground Mine

Vertical Drain in Underground Mine

Meridian Mine - Faena El Peñón
Chile

 | 

2018
Pexgol and Fresnillo: Allies in innovative piping solutions for mining.

Safety and durability: The heart of our solutions

Minera Fresnillo
Mexico

 | 

2021
Installation Of Pexgol Hanging Pipes In Underground Mine

Underground Mine Dewatering

Codelco Chuquicamata
Chile

 | 

2017
Pexgol Pipe Installation for Open Pit Mine Drainage.

Efficient Open Pit Mine Drainage

BHP Escondida Mine
Chile

 | 

2022
Dewatering With Low Ph Levels

Open Cast Mine Dewatering

Arcelor Mittal Mine
Mexico

 | 

2016