Skip to content

Transportation of Phosphoric Acid

Transportation of Phosphoric acid in a potassium nitrate plant

Estudo de Caso Nº

13

Cliente

Haifa Chemicals
Israel

|

1995

Condições de Trabalho

Phosphoric acid up to 85%. The maximum working condition is 6 bar and 80°C.

Solução Pexgol

Pexgol ½” (16 mm) up to 14” (355 mm).

Aplicação

Phosphoric acid.

Comprimento

1000 meters.

Categorias

Transportation of Phosphoric acid in a potassium nitrate plant

The Challenge

Corrosion in the pipes and leakages in the connections. Frequent replacement needed. Fiberglas and Rubber lined steel pipes are hard to maintain.

Pipe materials tried prior to Pexgol:

  • Rubber lined steel pipes in short sections
  • Fiberglass pipes

Pexgol Solution

Haifa Chemicals use Pexgol (PEX) pipes very successfully, since 1995 in all their process.

Diametr of ½” (16 mm) up to 14” (355 mm)

Pexgol pipes are used in the Phosphoric acid plant, in the potassium nitrate plant and in the waste treatment plant. Pexgol pipes work with Phosphoric acid up to 85%, The maximum working condition is 6 bar and 80 degrees Celsius.

The Economic

The original mean time between failures (MTBF) was short due to frequent leakages. Changing to Pexgol eliminated faileures completely.

No maintenance required.

Estudos de Caso Relacionados

Pexgol Pipe Installation for Open Pit Mine Drainage.

Efficient Open Pit Mine Drainage

BHP Escondida Mine
Chile

 | 

2022
Food Transport Pexgol vs HDPE

Food Transport Pexgol vs HDPE

Marine Farms
Chile

 | 

2017
Streamlining Mine Dewatering and Water Transportation with Pexgol Pipes at Cerro Negro Mine.

Overcoming Installation Hurdles and Enhancing Operational Efficiency

Newmont
Argentina

 | 

2022
Replacement of Titanium Pipes by Pexgol Pipes to Transport Acid Solution.

Process Plant: Transport of Leached Slurry

Barrick Gold – Pueblo Viejo
Dominican Republic

 | 

2018
Comparative Test for the Transport of Brine with HDPE and Pexgol Pipes.

Comparison of brine transport

Albemarle Salar
Chile

 | 

2020
In an engineering challenge, the Pexgol 225 mm (8”) Class 15 pipe proved to be the perfect solution for transporting tailings at the Mina Capela mining complex.

Environmental Protection and Efficiency in Tailings Management

Mina Capella - Grupo Peñoles
Mexico

 | 

2023