Transportation of Alcohol for the Production of Rum and Brandy

Transport of Concentrated Alcohol to 86% for the Production of Rum and Brandy

Estudo de Caso Nº

54

Cliente

Cuba Ron
Cuba

|

2016

Condições de Trabalho

86% alcohol concentration, pressure 3 bar, temperature 85°C / 185°F (distillery area)

Solução Pexgol

Pexgol 32, 63, 100 & 160 mm, Class 15

Aplicação

Transportation of Concentrated Alcohol, Rum and Brandy

Comprimento

1500 m

Categorias

Transport of Concentrated Alcohol to 86% for the Production of Rum and Brandy

The Challenge

Cuba Ron is the largest producer of rum in Cuba and manufacturer of brands such as Havana Club and Santiago de Cuba.
Cuba Ron needed to transport the rum and brandy between the different areas of the plant and to the cellars. For this application they used stainless steel and carbon steel pipes. Due to the corrosion of the alcohol, which was dangerous for the fluid transport since it could detach particles and affect it. Also, these lines suffered from corrosion on the outside of the pipes as the plant is located in a tropical area near the sea, making the environment corrosive helping the deterioration of the lines.

Pexgol Solution

Cuba Ron then looked for a long-term solution for the replacement of their steel pipes. The main concern when selecting a new pipe material was not affecting the flavor of the rum and brandy that they commercialized worldwide, and to find a pipe material that could withstand the difficult transport conditions for the line.

Therefore, they performed different chemical and taste tests before making the change. They performed tests on PE, ETFE and both suffered a chemical attack. When testing PE-X the tube reacted positively * for both chemical resistance and taste.

Given the excellent results, on-site tests were also carried out with a long-term pipeline.
The installation was quick and without complications despite the fact that the plant, being located in Cuba, did not have sophisticated equipment or certified personnel. Pexgol supplied pipes in long sections and mechanical accessories that were very easy to install and did not require any special tools.
The installation helped improve the production of the plant and prompted the client to renew all its lines with Pexgol pipe systems.

(*) The tests were carried out in the laboratories of Golan Plastic Products.

Estudos de Caso Relacionados

Improving drainage in the Media Luna mine with Pexgol.

Overcoming Geotechnical Challenges with Pexgol at Media Luna

Minera Media Luna
Mexico

 | 

2023
850 Meters of Pipe Replaced in Less Than 24 Hours, Without Affecting Residents.

Goodbye Asbestos: Pexgol Modernizes Thermal Water Network

Raquet Club Lake Chapala
Mexico

 | 

2024
Explore how Pexgol pipe replacement addressed the corrosion issue in Gordon Pool’s saltwater delivery system, ensuring efficient operation.

From Steel to Pexgol: A Plumbing Upgrade for Tel Aviv’s Gordon Pool

Gordon Pool
Israel

 | 

2023
Installation of a Drainage System in an Open Pit Mine.

Drainage System

BHP Pampa Norte – Cerro Colorado Mine
Chile

 | 

2020
Installation of a Drainage System between Dams in a Copper Mine.

Water Transport Between Dams

CODELCO – El Teniente Mine
Chile

 | 

2019
Water Drainage in Harsh Ground

Water Drainage at an Open-Cast Mine

Timmins Gold Corp Group, Molimentales del Noroeste Mine
Mexico

 | 

2016