Skip to content

Success in Agricultural Desalination: Water Supply Challenges

Pexgol technology can overcome challenges in shallow well applications, offering an efficient and cost-effective solution for leading companies in the agricultural industry.

Estudo de Caso Nº

123

Cliente

BerryMex
Mexico

|

2019

Condições de Trabalho

Temperature: 21°C / 69°F | Pump pressure: 163 PSI y 540 m^3/hr.

Solução Pexgol

Pexgol 250 mm (10″), SDR 11

Aplicação

Borehole

Comprimento

243 m / 797 ft

Categorias

Success in Agricultural Desalination: Water Supply Challenges

The Challenge

BerryMex, a leader in the agricultural industry and recognized for its high-quality production of strawberries, raspberries, blueberries, and blackberries, faced a significant challenge at its desalination plant in Mexico. The company needed an efficient and cost-effective solution to transport seawater from shallow wells to its treatment and desalination plant.

The shallow wells drilled next to the sea had to be constructed with corrosionresistant pipes, capable of withstanding the weight of the water column and the 1,250 kg INDAR submersible pump. Initially, BerryMex considered using plastic pipes like PVC or CPVC, but these would not withstand the weight, risking the loss of the pump. The other options, stainless steel or superduplex pipes, were too costly in terms of materials and installation.

Pexgol Solution

Pexgol introduced its innovative crosslinked polyethylene (PE-X) pipe as a corrosionresistant solution with the capacity to withstand the required weight. In addition, the low roughness factor of Pexgol pipes prevents scaling, which extends their lifespan and minimizes maintenance interruptions.

Since their installation, Pexgol pipes have shown exceptional performance in BerryMex’s four wells, with no issues or decrease in water supply to the desalination plant. The installation time in each well did not exceed 4 hours, demonstrating the efficiency of the process.

The BerryMex team was able to easily assemble the Pexgol pipes at the construction site, using electrofusion couplings and load clamps on a steel base plate. With only two joints required per well, the Pexgol pipe system proved to be a cost-effective and durable solution.

Estudos de Caso Relacionados

Dewatering without Supports

Open Cast Mine Dewatering

El Volcan Mine Arcelor Mittal
Mexico

 | 

2017
Installation of a Pexgol Elbow with Mechanical Joints to Replace HDPE.

Pexgol Elbow for Slurry Transport

Antioquia Gold
Colombia

 | 

2022
Pexgol and Fresnillo: Allies in innovative piping solutions for mining.

Safety and durability: The heart of our solutions

Minera Fresnillo
Mexico

 | 

2021
Transportation of water with solids from an open cast mine

Open Cast Mine Dewatering

Doña Inés de Collahuasi SCM, Collahuasi Mine
Chile

 | 

2013
Reduction of material build-up in brine and brine/acid lines

Mineral Processing – Brine Transportation

SQM,Pedro Valvidia Mine
Chile

 | 

2010
Replacement Of PVC Piping for PE-X in a Industrial Heating System.

Transport of Hot Air for Advanced Agriculture

Teva Post
Israel

 | 

2022