Sewage Water Transportation

Sewage Water Transportation with 300 PPM Hydrogen Peroxide

Estudo de Caso Nº

47

Cliente

BorsodChem
Hungary

|

2011

Condições de Trabalho

Extreme corrosion

Solução Pexgol

Pexgol 200 mm Pexgol. Prefabricated Elbows 200 mm

Aplicação

Sewage Transportation

Comprimento

n/a

Categorias

Sewage Water Transportation With 300 Ppm Hydrogen Peroxide

The Challenge

BorsodChem requiered to transport sewage water with 300 ppm hydrogen peroxide for a medium of manufacturing procedure of
car-spareparts. The client has tested di erent pipe material such as HDPE, steel and ductile cast iron (both with and without lining), but none of this materials could withstand the corrosion.

Pexgol Solution

The client decided to install a Pexgol pipe 200 mm. The installation was conducted with Plasson HDPE electrofusion technology combined
with butt fusion preparing tools (the butt surfaces of pipes were made plain / the blocking elements of EF couplers were removed – this way the aggresive media could not reach the internal surface of the EF couplers).

The pipe is still working till today withstanding the high corrosive conditions.

Estudos de Caso Relacionados

Installation of Pexgol Pipe for a Intake Line to Transport Hot Abrasive Brine Slurries

Hot & Abrasive Potash Brine Processing

Fertilizer Company
Canada

 | 

2017
Pexgol technology can overcome challenges in shallow well applications, offering an efficient and cost-effective solution for leading companies in the agricultural industry.

Success in Agricultural Desalination: Water Supply Challenges

BerryMex
Mexico

 | 

2019
Transportation of River Water in Rough Terrain

Water Transport in Complex Terrain

Southern Copper Corporation
Peru

 | 

2019
Reduced wear and increased durability in the sand cleaning process at KSB de México.

Improving efficiency in steel foundry with Pexgol

KSB de Mexico
Mexico

 | 

2023
In an engineering challenge, the Pexgol 225 mm (8”) Class 15 pipe proved to be the perfect solution for transporting tailings at the Mina Capela mining complex.

Environmental Protection and Efficiency in Tailings Management

Mina Capella - Grupo Peñoles
Mexico

 | 

2023
Installation of Pexgol Pipes for Drainage in a Vertical Ground

Vertical Dewatering

Ferrexpo Poltava Mining
Ukraine

 | 

2019