Process Plant: Transport of Leached Slurry

Replacement of Titanium Pipes by Pexgol Pipes to Transport Acid Solution.

Estudo de Caso Nº

62

Cliente

Barrick Gold – Pueblo Viejo
Dominican Republic

|

2018

Condições de Trabalho

Acid solution at 100°C. Chemical Composition: SiO2 64%; Al203 11.25%; As 0.05%; Ca 0.17%; Cr 0.01%; Cu 0.03%; Fe 5.37%; K 0.04%; Mg 0.02%; Na 0.08%; Pb 0.04%; Zn 0.17%

Solução Pexgol

Pexgol 63 mm (2”), Class 15

Aplicação

Slurry transportation

Comprimento

2 m / 6.5 ft flanged sections 45° & 90° prefabricated elbows 100 m / 328 ft coils

Categorias

Replacement of Titanium Pipes by Pexgol Pipes to Transport Acid Solution.

The Challenge

Barrick Gold at the Pueblo Viejo mine was transporting slurry (acid solution) through titanium pipes GR2, SCH80S 2 for the drainage of the autoclaves, using this material due to the combination of low pH and abrasion in the fluid.

When using titanium, the tubes and elbows needed to be replaced on average between 3 and 6 months due to wear.

Pexgol Solution

The team of Pexgol together with the engineers of the Process Plant decided to carry out a test to replace a 2 meter (6.5 ft) section of their titanium pipe.

The first Pexgol pipe was installed at the end of the year 2017. This pipe section is still in operation, surpassing on a large scale the service life with the pipeline used previously.

Given the success of the test, almoust the rest of the line has been replaced, including 45° and 90° prefabricated elbows, thus avoiding plant stoppages and unnecessary losses.

Due to the difference in temperature at the time of installation and the operating conditions, part of the installed tubes suffered the “snake” effect. Due to aesthetic and operational issues, this problem was solved by installing additional support, leaving the tubes straight and firm.
Pexgol pipes resistance to temperature and abrasion combined with the smooth internal surface made the installation a success.

Estudos de Caso Relacionados

Pipe installation on a mountain

Meltdown Water Transport

Codelco Andina, TADA 1-2 Project
Chile

 | 

2013
Water transportation with sulfide and cobalt particles

Water and Sulfide Transportation

Moa Nickel S.A. Sherritt
Cuba

 | 

2015
Innovation and improvement in fluid transportation in the oil and gas industry.

Streamlining Effluent Treatment with Pexgol

Pan American Energy
Argentina

 | 

2023
Installation of a Pexgol Pipe on top of a Steel Outdated Pipe

Carriage of Chemicals at Sea Port

Ashdod Sea Port
Israel

 | 

2016
Installation Oof Pexgol Pipes through a Chimney for Compressed Air.

Transport of Compressed Air for Underground Mine

HMC Gold
Chile

 | 

2021
Installation of Pexgol Pipe in a Formation Water Treatment Plant.

Secondary Injection Water Plant

YPF
Argentina

 | 

2020