Skip to content

Pioneering Space Launches with Ground-breaking Piping Solutions

Delivering Durability and Flexibility for a Sustainable Approach to Space Access.

Estudo de Caso Nº

147

Cliente

SpinLaunch
USA

|

2021

Condições de Trabalho

Temperature: 70°C / 158°F | Flow: 300 gpm, 150 gpm, 100 gpm respectively | Pressure: 80 psi, 90 psi and 120 psi respectively | Components of the fluid: Water

Solução Pexgol

Pexgol 90, 110 & 160 mm, class 15

Aplicação

Water Brake Cooling, Oil Heat Exchanger Cooling, Vacuum System Cooling

Comprimento

750 m / 2460 ft

Categorias

Pioneering Space Launches with Ground-breaking Piping Solutions

The Challenge

SpinLaunch, an avant-garde space technology firm, introduced a radical departure from conventional fuel-based rockets with their electricity-powered kinetic launch system. This inventive approach to space access required not just a sustainable space solution but also a parallel ground-based system that could match its efficiency and robustness. In the high desert conditions, SpinLaunch aimed for a piping solution that was resilient, could be laid both above and below ground, and would survive freezing temperatures without sustaining damage.

Pexgol Solution

Pexgol, with its state-of-the-art PE-X piping solutions, stepped in to address SpinLaunch’s unique requirements. The company’s 90, 110, and 160 mm class 15 pipes, spanning a total of 750 meters, were introduced for water brake cooling, oil heat exchanger cooling, and vacuum system cooling. The pipes, able to endure a temperature of 70°C (158°F) and different flow rates and pressures, primarily carried water as the fluid component. The easy-to-install system offered flexibility, allowing for both subterranean and above-ground installation with minimal elbows.\

The Pexgol pipes, known for their durability, ensured that even in freezing desert temperatures, the contained liquid wouldn’t damage the structure. The efficient design and collaboration between Pexgol and SpinLaunch resulted in a fast, flexible, and long-lasting solution, fitting perfectly with the client’s revolutionary space access approach.

Estudos de Caso Relacionados

Pipe installation on a mountain

Meltdown Water Transport

Codelco Andina, TADA 1-2 Project
Chile

 | 

2013
Guaranteeing an efficient water supply with the Pexgol piping solution in the Mendoza-San Juan Highway project.

Streamlining Water Supply in Highway Construction

Chediack / Ceosa
Argentina

 | 

2023
Installation of Pexgol Pipe to Transport Brine at High Pressure in a Borehole.

Transporting Brine at High Pressure

Mekorot
Israel

 | 

2020
Transport of Formation Water with Hydrocarbons.

Formation Water Transport

ROCH
Argentina

 | 

2015
Replacement of a HDPE Pipe for a Pexgol Pipe

Compressed Air Transportation

Saucito S.A. de C.V. Mine
Mexico

 | 

2017
Replacing steel pipes suffering from sediment formation

Transportation of Ore Slurry

RUSAL, aluminum factory
Russia

 | 

2012

Categorias