Pexgol’s Solution for CFE: A Leap in Durability and Efficiency

Transforming water transportation with Pexgol technology

Estudo de Caso Nº

154

Cliente

Comisión Federal de Electricidad
Mexico

|

2023

Condições de Trabalho

Temperature: 30°C / 86°F | Pressure: 8kg

Solução Pexgol

Pexgol 6″, class 15

Aplicação

Sea water transport

Comprimento

150 m / 15748 ft 90° elbows and mechanical flanged joints

Categorias

Pexgol’s Solution for CFE: A Leap inDurability and Efficiency

The Challenge

The Federal Electricity Commission (CFE), Mexico’s leading electricity company, at its Empalme (Sonora) facility, faced significant challenges with its existing stainless steel pipelines used for transporting treated seawater. The saline environment and corrosive nature of seawater led to frequent corrosion of the steel pipes, requiring constant shortterm maintenance efforts. Seawater is used for cooling turbines, so any failure in the line can lead to downtime in production. Replacing stainless steel pipes required skilled welders and large cranes to handle the tubes due to their high weight.

The Solution

Pexgol provided a comprehensive solution with its 6” RD11 pipes, specifically designed for challenging conditions like those at CFE. Pexgol pipes, known for their high chemical resistance and corrosion resistance, offered a robust alternative to stainless steel.

Pexgol’s flanged coupling and elbow fittings facilitated a smooth installation process on the existing rack, and the lightweight nature of Pexgol pipes allowed for easier handling and maneuvering during installation. Quickpipes Systems provided on-site
technical support, ensuring a seamless transition to Pexgol pipes. This solution not only accelerated the installation process but also significantly reduced maintenance needs, thanks to Pexgol’s durability and the long pipe lengths that minimized the need
for joints.

Estudos de Caso Relacionados

Scale build up reduction - highly concentrated lime solution

Process Water – Brine Transportation

SQM Nueva Victoria-Iquique
Chile

 | 

2010
Installation of a Drainage System in an Open Pit Mine.

Drainage System

BHP Pampa Norte – Cerro Colorado Mine
Chile

 | 

2020
Extraction of underground water through wells

Extraction of Underground Water

Doña Inés de Collahuasi SCM, Collahuasi Mine
Chile

 | 

2010
Dry Gas Line for Pump Activation.

Dry Gas Transportation

ExxonMobil
Argentina

 | 

2020
Installation of Pexgol Pipesf for the Drainage of an Underground Mine.

High Pressure Drain in Underground Mine

Ojos del Salado Mine – Lundin Mining
Chile

 | 

2018
Pexgol pipe was selected for the Assembly of a Muddy Water Transport Line for a Palm Oil Processing Company.

Efficient Choice: PE-X Pipe for the Palm Industry

Extractora Monterrey
Colombia

 | 

2023