Skip to content

Pexgol’s Pipe Solution Enhances Salmon Farming

Improving the efficiency of salmon farming with the superior solution of Pexgol pipes.

Estudo de Caso Nº

136

Cliente

Mowi
Chile

|

2021

Condições de Trabalho

Temperature: 10°C / 50°F | Flow: 4 tons per day | Pressure: 1 bar

Solução Pexgol

Pexgol 90 mm, Class 12

Aplicação

Aquaculture (salmon feeding)

Comprimento

1300 m / 4265 ft

Categorias

Improving the efficiency of salmon farming with the superior solution of Pexgol pipes.

The Challenge

Mowi ASA, a Norwegian seafood company specializing in salmon farming, operates in various countries globally. Their operations span Norway, Scotland, Canada, the Faroe Islands, Ireland, and Chile. In one of their Chilean locations, they encountered significant difficulties with their existing High-Density Polyethylene (HDPE) feeding lines.

The HDPE pipes were supposed to last an entire farming cycle, approximately 16 months. However, they would often break around the eighth month. This issue led to constant repairs and loss of food due to the ruptures, impacting efficiency and productivity in their operations. To address this, Mowi ASA decided to conduct a trial at one of their farms, replacing half of their feeding lines with Pexgol pipes and leaving the remaining half with HDPE.

The Solution

Pexgol provided a class 12, 90mm pipe for the project, amounting to a total of 1300 meters. The pipes were used in an aquaculture application specifically for feeding salmon at sea, with a daily flow of 4 tons of food pellets at a temperature of 10°C and pressure of 1 bar.

The trial results were resoundingly successful. While the HDPE pipes continued to break after the eighth month, the Pexgol pipes remained intact throughout the farming cycle. This victory attested to the long lifespan and flexibility of the Pexgol pipes, making them a more efficient and cost-effective solution.

As a result of the successful trial, Mowi ASA chose to continue the test in another cultivation center, further solidifying Pexgol’s role in transforming their operations.

Estudos de Caso Relacionados

How Pexgol piping improved the fire network system infrastructure in a paint manufacturing plant.

Pexgol Piping for Fire Network System Expansion

Wall
Argentina

 | 

2023
Case Study: Pexgol’s Solution at the Palm Oil Plant.

Efficiency and Durability in Handling Muddy Water

Industrial Aceitera del Casanare
Colombia

 | 

2023
Installation of Pexgol Pipes for a Free Chlorine Potable Water Supply.

Free Chlorine Potable Water Supply

Rabin Medical Center
Israel

 | 

2020
Grey Water Transportation

Recovered Water Transportation

Coeur Mexicana S.A. de C.V. Palmarejo
Mexico

 | 

2017
Installation of Pexgol Pipe in a Formation Water Treatment Plant.

Secondary Injection Water Plant

YPF
Argentina

 | 

2020
Installation of a Drainage System between a Well and a Mining Dam.

Well Drainage at Mining Dam

CODELCO – El Teniente Mine
Chile

 | 

2019