Leached Slurry Transportation

Slurry transportation with high nickel levels

Estudo de Caso Nº

18

Cliente

Moa Nickel S.A. Sherritt
Cuba

|

2013

Condições de Trabalho

Extreme transport temperature (110°C).

Solução Pexgol

Pexgol 500 mm, Class 15 & Pexgol 355 mm, Class 15.

Aplicação

Slurry transportation.

Comprimento

350 m.

Categorias

Slurry transportation with high nickel levels

The Challenge

Moa Nickel used to transport leached slurry from the tubular reactors to the CCD thickener feed line. This process caused several issues on different pipe materials. The transported fluid was composed by:

  • 28-32 g/l acid
  • 1,00 g/l N
  • 0,54 g/l Co
  • 1,00 g/l Fe
  • 21,00 g/l SO4
  • 30,0 g/l free acids
  • Solids: 0,086% Ni, 0,013% Co, 46,00% Fe

Previously, titanium Sch20 pipes were installed, but if suffered deformations and it needed to be repaired constantly. The titanium pipe was replaced for a stainless steel pipe 316 Sch40, and it lasted 8 years and it finally required to be replaced because it presented wear issues.

Pexgol Solution

Golan provided 11.8 meters of pipes sections with mechanical joins that could resist corrosion, high temperatures and wear with no effort.

Regarding the prices per meter, installation costs and maintenance, versus stainless steel and titanium pipes, Pexgol proved to be the most convenient option.

Estudos de Caso Relacionados

Lasta2 Filter Press Feed Lines

Concentrated Copper Transportation

BHP Billiton, Olympic Dam, Australia
Australia

 | 

2014
Installation of 1000 Meters of PE-X Pipe for an Underground Mine.

Mining Drainage Lines

Lundin Mining – Alcaparosa Mine
Chile

 | 

2019
Grey Water Transportation

Recovered Water Transportation

Coeur Mexicana S.A. de C.V. Palmarejo
Mexico

 | 

2017
Transport of Leached Mud from the Treatment Plant to an Oxidation Lagoon

Palm Oil: Transport of Leached Mud

Industria Chiquibul
Guatemala

 | 

2018
Installation of Pexgol Pipes for Drainage of an Underground Mine

Vertical Drain in Underground Mine

Meridian Mine - Faena El Peñón
Chile

 | 

2018
Installation of Pexgol Pipes in a Fish Processing Plant.

Fish Oil Transport at 36°C / 96.8°F

Guaymas Protein Company
Mexico

 | 

2018