Skip to content

Gas Wells: Formation Water Treatment

Installation of Pexgol pipes for the transport of formation water (gas and minerals)

Estudo de Caso Nº

64

Cliente

Canacol
Colombia

|

2018

Condições de Trabalho

Water with gas and minerals | Pressure: 15 bar | Temperature: 20°C

Solução Pexgol

Pexgol 160 mm (6”), Class 15

Aplicação

Formation water transportation

Comprimento

11 Km

Categorias

Installation of Pexgol pipes for the transport of formation water (gas and minerals)

The Challenge

Canacol together with the engineering company A.B. Projects had the mission of creating new wells for gas extraction and transporting it for distribution in Cordoba, Colombia.
Due to the high pressure for the gas transportation (above 100 bar) the client used Flexsteel (flexible pipes made of layers of polyethylene and steel). Additionally, at the exit of the wells, the gas had to be separated from the water that was underground through a turbine. But the separated water still contained traces of gas and minerals that needed to be treated once again.

Pexgol Solution

Canacol and A.B. wanted to use a reliable pipe to carry out the separation of water from surplus gases and minerals, but having used the Flexsteel pipe would have incurred on excessive expenses. Therefore they selected Pexgol thanks to its possibility of supply in long lengths, its high levels of safety and its low installation cost (versus other materials for high and low pressures).

The 11 km of pipe were installed in just one week: the uncoiling and laying of the pipes took 3 days and then the joints were connected by electrofusion and the pipes buried.

Pexgol proved once again to be an excellent solution for oil or gas wells where it is required to transport water for treatment with pressures that are below 30 bar.

Estudos de Caso Relacionados

Installation of Pexgol Pipe for Transportation of Mining Tailings.

Tailings Transport with 50% solids

Golden Resource Corp. – Don David Gold Mine
Mexico

 | 

2019
Pexgol pipe was selected for the assembly of a muddy water transport line for a palm oil processing company.

Transport of Muddy Water for Palm Oil Extractor

Extractora Poligrow
Colombia

 | 

2022
Water transportation with sulfide and cobalt particles

Water and Sulfide Transportation

Moa Nickel S.A. Sherritt
Cuba

 | 

2015
Installation of Pexgol Pipes for Transporting Hot Water.

Hot Water Supply

Hilton
Israel

 | 

2020
Installation of Pexgol Pipes in a Fish Processing Plant.

Fish Oil Transport at 36°C / 96.8°F

Guaymas Protein Company
Mexico

 | 

2018
A Challenging Project That Eliminated Booster Stations Thanks to Pexgol’s Flexibility.

Vertical Solution for Mine Dewatering in Fresnillo

Fresnillo
Mexico

 | 

2025