Fluorosilicic Acid Transport

Pexgol Pipe for the Transport of Fluorosilicic Acid.

Estudo de Caso Nº

70

Cliente

Phosphate Mine – ICL Rotem
Israel

|

1995

Condições de Trabalho

Pressure: 5 bar / Temperature: 60°C

Solução Pexgol

Pexgol 250 mm, Class 10 | Pexgol 280 mm, Class 10 | Pexgol 315 mm, Class 10

Aplicação

Acid transport

Comprimento

Systems made up of hundreds of meters with elbows, tees and branches.

Categorias

Pexgol Pipe for the Transport of Fluorosilicic Acid.

The Challenge

From the beginning ICL Rotem used HDPE, 316 stainless steel and rubberized steel pipes for the transport of fluorosilicic acid. Beyond the costly installation, the tubes suffered from corrosion and wear, forcing maintenance workers to replace the tubes every 5 to 9 months, and on several occasions to stop production altogether.

Pexgol Solution

  • • In the first instance, PE-X test tubes were placed in the fluid to be transported. Once the laboratories certified that the acid did not carry out any chemical attack on the tubes, 12 meter pipe sections were installed with electrofusion couplings.
  • Since then, in 1995 till today thousands of meters have been installed transporting fluorosilicic acid without having to replace the tubes or have to carry out any maintenance.
  • The resistance to high temperatures, abrasion and chemical attacks caused the maintenance costs in the process plant to be significantly reduced and the investment amounts to be reduced in new plant expansion projects.

Estudos de Caso Relacionados

Installation of Pexgol Pipe to Transport Fiber Optic Cables.

Fiber Optic Cables Through a Vertical Shaft

Sinohydro
Israel

 | 

2021
Pexgol Pipe to Transport Effluents at 30°C / 86°F in an Underground Mine.

Pumping Mining Effluents

AngloGold Ashanti
Brazil

 | 

2019
Potable Water Supply on Harsh Terrain

Potable Water Supply on Harsh Terrain

Mekorot / Beit Shemesh Water Company
Israel

 | 

2017
Installation of a Fire Supply Network in a Oil Treatment Plant.

Fire Network Supply

YPF
Argentina

 | 

2021
Installation of a Drainage System between Dams in a Copper Mine.

Water Transport Between Dams

CODELCO – El Teniente Mine
Chile

 | 

2019
Transport of Concentrated Alcohol to 86% for the Production of Rum and Brandy

Transportation of Alcohol for the Production of Rum and Brandy

Cuba Ron
Cuba

 | 

2016