Fiber Optic Cables Through a Vertical Shaft

Installation of Pexgol Pipe to Transport Fiber Optic Cables.

Estudo de Caso Nº

99

Cliente

Sinohydro
Israel

|

2021

Condições de Trabalho

500 meters hanging without supports inside service shaft

Solução Pexgol

Pexgol 50 mm (2”) Class 15 | Pexgol 63 mm (2”) Class 15

Aplicação

Fiber Optic Cables Transport

Comprimento

Pexgol 50 mm: 14,050 m / 46,095 ft | Pexgol 63 mm: 9,100 m / 29,855 ft

Categorias

Installation of Pexgol Pipe to Transport Fiber Optic Cables.

The Challenge

Sinohydro, a Chinese state-owned hydropower engineering and construction company, wanted to install fiber optic cables through a vertical shaft 500 meters deep. They needed conduit pipes that would withstand the tensile forces of the pipe weight. The pipes have to be embedded in concrete, so they have to resist the temperature of the concrete during casting.

Pexgol Solution

Pexgol was chosen due to their ability to withstand high tensile forces and high temperatures.The 63 mm pipe was provided in 13 coils of 700 m each and the 50 mm pipe was provided in 13 coils of 1080 m each.
Only a double mechanical connector was used to hold the pipes above the pit.

Estudos de Caso Relacionados

Transportation of Phosphoric acid in a potassium nitrate plant

Transportation of Phosphoric Acid

Haifa Chemicals
Israel

 | 

1995
The Original Design for a Wastewater Treatment Plant included Stainless Steel Pipes, but after discovering the Superior Capabilities of Pexgol Pipes, the Entire Facility was Switched Over.

New Wastewater Treatment Plant with Pexgol Pipes

Wastewater Treatment Plant
Israel

 | 

2022
Acid liquor line with high levels of abrasion and sedimentation

Abrasive Liquid Transportation

Moa Nickel S.A. Sherritt
Cuba

 | 

2014
Adapting to the demands of the process: how Pexgol solves the problems of corrosion and abrasion in the extraction of palm oil.

Implementation of Pexgol Pipelines for the Transport of Muddy Water

IACSA
Colombia

 | 

2023
Cement Slurry Injection to an Underground Mine

Backfill

Aguilar Mine
Argentina

 | 

2015
Substitution of a Steel Spool for PE-X Coated for Pumping Formation Water.

Replacement of a Steel Spool with Pexgol

Enap Sipetrol
Ecuador

 | 

2021