Dewatering Through Shafts
Dewatering tThrough Shafts for an Underground Lead-Zinc Mine.
Estudo de Caso Nº
81
Cliente
|
Condições de Trabalho
Solução Pexgol
Aplicação
Comprimento
Categorias
The Challenge
Esan had to pump dirty water from -600 meters at their underground lead-zinc mine, through narrow shafts to upper levels of the mine.
They usually used HDPE and steel pipes but they had clogging problems. This time Esan wanted a pipe that will not clog and will be very easy to install, with no need of fittings installed in the narrow shafts. They tried to find alternatives to prevent leakege problems on the fittings that caused to change them many times.
Pexgol Solution
The client decided to install 350 meters of Pexgol pipe. They choose Pexgol due to it’s experience with providing long pipe sections that enable to avoid installing fittings in narrow shafts and because of the resistance of the pipe to scale build up.
Thanks to Pexgol the installation took just 6 hours, Esan reduced their operation downtime.
Esan built their own decoiler and decoiled the pipe by themselves.