Abrasive Liquid Transportation

Acid liquor line with high levels of abrasion and sedimentation

Estudo de Caso Nº

21

Cliente

Moa Nickel S.A. Sherritt
Cuba

|

2014

Condições de Trabalho

70°C – 3 Bars.

Solução Pexgol

Pexgol 355 mm & Pexgol 315 mm, Class 12.

Aplicação

Acid liquor transportation with nickel, iron, cobalt and NaOH particles.

Comprimento

150 m.

Categorias

Acid liquor line with high levels of abrasion and sedimentation

The Challenge

Moa Nickel used rubber lined steel pipes to transport acid liquor.

Between 3 and 6 months they required to stop the plant for more than 24 hours, due to sedimentation issues that the steel pipe presented, reducing it inside diameter 60% less.

Furthermore, the steel pipe suffered leaks due to lined releases. Since the first moment that the liquid touched the steel, in a matter of minutes it was causing a leak.

Pexgol Solution

Golan provided Pexgol pipes of 355 mm and 315 mm with mechanical joints, and it only required to stop the plant one year after of the installation.

During that time, and due to the high sedimentation levels, the inside diameter was reduced just 30% less. The repair lasted only 4 hours, and it was done by hammer blows, in order to remove the material that

was obstructing the pipe. At the end, the pipe was functioning without problems.

Pexgol, it not only achieved to raise the production, but also the maintenance expenses were reduced. For every hour that the plant stopped, it cost hundreds of dollars to the company.

Estudos de Caso Relacionados

Installation of Pexgol Pipes for Drainage in a Vertical Ground

Vertical Dewatering

Ferrexpo Poltava Mining
Ukraine

 | 

2019
The impact of Pexgol piping on pump performance improvement and maintenance cost reduction at Sales de Jujuy.

Improvement in Brine Management through Pexgol Piping

Sales de Jujuy
Argentina

 | 

2023
Transport Of Palm Oil Slurry At 95°C.

Transport of Palm Oil Slurry

Loma Fresca
Colombia

 | 

2017
Pan American Energy implements an efficient and sustainable solution for brine transportation.

Fast and Safe Brine Transport in the Salar de Hombre Muerto

Lithos (PAE)
Argentina

 | 

2024
Transformation in the logistics of formation water.

Aconcagua Energía Implements Pexgol Solutions for Efficiency and Savings

Aconcagua Energía
Argentina

 | 

2023
Transportation of water with solids from an open cast mine

Open Cast Mine Dewatering

Doña Inés de Collahuasi SCM, Collahuasi Mine
Chile

 | 

2013