Water Transport in Copper Mine

Work with High Pressures and Extreme Ambient Temperature

Case Study Nº

68

Customer

Zaldivar SPA Mine
Chile

|

2018

Working Conditions

Pressure: 24 & 30 bar | Ambient temperature: 5° to 28°C / 41° to 82°F

Pexgol Pipes

Pexgol 160 mm (6”), Class 15 | Pexgol 160 mm (6”), Class 19 | Pexgol 160 mm (6”), Class 24 | Pexgol 160 mm (6”), Class 30

Application

Water transport

Lenght

9500 m

Categories

Work with High Pressures and Extreme Ambient Temperature

The Challenge

The mining company Zaldivar SPA (Barrick) needed to implement a line of drinking water from the storage pond to the camp sector, crossing the entire mining site. Two thirds of the layout required a pressure of 24 and 30 bar, using the minimum amount of joints possible and in the shortest time conceivable.

Pexgol Solution

It was decided to install 9500 m of Pexgol pipe due to its advantages:

  • High pressure resistance (24 and 30 bar)
  • Supply in long lengths (sections of up to 600 meters) minimizing assembly time and number of joints.
  • Resistance to mechanical stresses due to pipe dragging in hard to reach areas.

The installation was simple, fast and safe. Without resources or special tools, shortening the known assembly program with HDPE pipes.

Related Case Studies

Installation Oof Pexgol Pipes through a Chimney for Compressed Air.

Transport of Compressed Air for Underground Mine

HMC Gold
Chile

 | 

2021
Replacement of Steel Pipes with Pexgol for Testing Centrifugal Pumps.

Pexgol for Centrifugal Pump Test

Flowserve
Argentina

 | 

2022
Grey Water Transportation

Recovered Water Transportation

Coeur Mexicana S.A. de C.V. Palmarejo
Mexico

 | 

2017
Biodiesel Transport through the Colombian Jungle

Biodiesel Transport

Indupalma (Oro Rojo Plant)
Colombia

 | 

2012
Replacement of HDPE Pipes For Pe-X to Transport Industrial Treated Water.

Industrial Waste Water to MBR Treatment Facility

Chip Manufacturer
Israel

 | 

2021
Pipe installation on a mountain

Meltdown Water Transport

Codelco Andina, TADA 1-2 Project
Chile

 | 

2013