Water Drainage at an Underground Mine
Water Drainage From the Inside of an Underground Mine
Estudo de Caso Nº
31
Cliente
El Peñón Yamana Gold, Meridian Mine
Chile
|
2016
Condições de Trabalho
Extreme temperatures (-5° to 38°C).
Solução Pexgol
Pexgol 160 mm Class 15 (SDR 11).
Aplicação
Water drainage.
Comprimento
600 m.
Categorias
The Challenge
The water drainage from the inside of Meridian underground mine was processed through an HDPE 12 meter pipe that required 50 joints to be installed. The total installation time was 4 days, with no chance to minimize costs. Furthermore, the pump operated over it efficiency levels.
Pexgol Solution
A 600 meters Pexgol pipe 160 mm Class 15 was provided, in one section without joints. The Pexgol pipe was carried for 6 kilometers in 2 turns, which caused as a result 50% of time saved in the installation.
Due to the lower load losses, now the pump operates at its mayor efficiency level.
Estudos de Caso Relacionados
Transport of Cyanide Water
Equinox Gold
Mexico
|
2022
Compressed Air Transportation
Saucito S.A. de C.V. Mine
Mexico
|
2017
Open Cast Mine Dewatering
El Volcan Mine Arcelor Mittal
Mexico
|
2017