Water Drainage at an Open-Cast Mine

Water Drainage in Harsh Ground

Estudo de Caso Nº

32

Cliente

Timmins Gold Corp Group, Molimentales del Noroeste Mine
Mexico

|

2016

Condições de Trabalho

Solar exposure, 14 bars.

Solução Pexgol

Pexgol 225 mm, Class 15 (SDR 11).

Aplicação

Water drainage.

Comprimento

200 m.

Categorias

Water Drainage In Harsh Ground

The Challenge

At “Molimentales” Mine in order to continue with their open-cast mining operations, it was necessary to drainage water from some sections in the ground. Formerly, the mine used an HDPE pipe of 12 meter sections, but they had constant issues due to leaks in the joints.

Pexgol Solution

A Pexgol pipe was provided, in 100 meters sections, in order to have less joints and thereby less leak risks.

Furthermore, the installation was fast and simple due to the lack of welds, and the pipes were dragged with the equipment that the mine already had available.

Estudos de Caso Relacionados

Guaranteeing an efficient water supply with the Pexgol piping solution in the Mendoza-San Juan Highway project.

Streamlining Water Supply in Highway Construction

Chediack / Ceosa
Argentina

 | 

2023
Addressing Scaling and Line Plugging with Advanced PE-X Piping.

Slurry: Pexgol’s Superior Alternative to Traditional Piping

Chip Manufacturer
USA

 | 

2022
The innovative solution from Pexgol for Anglo American Peru’s piping challenges.

Navigating extreme conditions with Pexgol’s PE-X pipes

Anglo American Perú
Peru

 | 

2023
Installation of Pexgol Pipes for Transporting Hot Water.

Hot Water Supply

Hilton
Israel

 | 

2020
Replacement of a HDPE Pipe for a Pexgol Pipe

Slurry Transportation

Sabinas Mine
Mexico

 | 

2017
Transportation of water with solids from an open cast mine

Open Cast Mine Dewatering

Doña Inés de Collahuasi SCM, Collahuasi Mine
Chile

 | 

2013