Condições de Trabalho
Pressure 100 Psi; Flow 225 mД/h; Specific Weight 1.2 t; Solids 20-30%.
Solução Pexgol
Pexgol 10” 250 mm, Class 15 (SDR 11).
Aplicação
Slurry transportation.
Comprimento
200 meters.
Categorias
The Challenge
Tizapa Mine formerly installed an HDPE line were they used to transport slurry. This pipe suffered several failures on the joints, so did the thermo-fusions and the stub-ends as well.
They determinate that the failures were caused by small water hammers on the line.
Pexgol Solution
Due to this special circumstances, Tizapa Mine decided to install Pexgol pipes for the following reasons:
- Supplied in long lengths coils: Of 100 meters each, reducing possible failures in the joints.
- It high resistance to water hammers.
- Burst pressure: 3 times higher than nominal pressure.
- Safe joints: They don’t deform neither detach caused by a pressure surge.
- Quick installation: Coils were uncoiled in 1.5 work hours, without any complex equipment.
Estudos de Caso Relacionados
Mine Dewatering at Low Temperature
Ferrexpo Yeristovo Mining
Ukraine
|
2019
Open Cast Mine Dewatering
El Volcan Mine Arcelor Mittal
Mexico
|
2017
Improving efficiency in steel foundry with Pexgol
KSB de Mexico
Mexico
|
2023