Replacement of Steel Pipes with Pexgol for Testing Centrifugal Pumps.

Estudo de Caso Nº

107

Cliente

Flowserve
Argentina

|

2022

Condições de Trabalho

Flow: 7 kg/cm2 | Temperature: 55°C / 131°F

Solução Pexgol

Pexgol 250 mm, class 12 + Tee fittings & flanged electrofusion elbow

Aplicação

Centrifugal pump testing

Comprimento

36 m / 118 ft

Categorias

Replacement of Steel Pipes with Pexgol for Testing Centrifugal Pumps

The Challenge

Flowserve is an American multinational corporation and one of the largest providers of industrial and environmental machinery such as pumps, valves, mechanical end seals, automation, and services to the power, oil, gas, chemical, and other industries.

To carry out tests on centrifugal pumps in the laboratory, the company used 10-inch carbon steel pipes. As the design is different in each case, the assembly and disassembly of very heavy pipes were periodically required with the risk that this implies. It was also necessary to use chemical products to prevent corrosion of the pipe.

Pexgol Solution

The client decided to replace its carbon steel pipes with Pexgol. Since they are 6 times lighter than carbon steel pipes. Therefore, they allowed to reduce the assembly and disassembly times, with less personnel and lower risks of accidents for the operators. On the other hand, the problem of corrosion that attacked the steel pipes was completely ruled out.

The joints used at the ends of the pipes were flanged mechanical couplings. In addition, Tee fittings and flanged Pexgol elbows were used.

Estudos de Caso Relacionados

Drainage in Underground Mine with Slopes Between 40° and 90°.

Water Drainage in Underground Mine

NEMISA Mine
Mexico

 | 

2018
Transportation of water with solids from an open cast mine

Open Cast Mine Dewatering

Doña Inés de Collahuasi SCM, Collahuasi Mine
Chile

 | 

2013
Installation of Pexgol Pipes in a Fish Processing Plant.

Fish Oil Transport at 36°C / 96.8°F

Guaymas Protein Company
Mexico

 | 

2018
Installation of a Pexgol Line 200 Meters Deep at an Underground Mine

Transport of Compressed Air

Meridian Mine – Faena El Peñón
Chile

 | 

2018
Pexgol Pipe Installation for the Transport of Cyanide Water.

Transport of Cyanide Water

Equinox Gold
Mexico

 | 

2022
Installation Of Pexgol Hanging Pipes In Underground Mine

Underground Mine Dewatering

Codelco Chuquicamata
Chile

 | 

2017