Skip to content

Fish Oil Transport at 36°C / 96.8°F

Installation of Pexgol Pipes in a Fish Processing Plant.

Estudo de Caso Nº

97

Cliente

Guaymas Protein Company
Mexico

|

2018

Condições de Trabalho

Temperature: 36°C / 96.8°F

Solução Pexgol

Pexgol 90 mm (3”) Class 15

Aplicação

Fish oil transport

Comprimento

150 m / 492.12 ft

Categorias

Installation of Pexgol Pipes in a Fish Processing Plant.

The Challenge

Guaymas Protein, a Mexican company dedicated to the production and commercialization of fishmeal, oil and soluble fish concentrate worldwide, had an underground carbon steel pipeline, where they transported fish oil from one container to another.

These pipes rusted in a very short period of time due to the salinity, humidity and conditions where the plant is located, resulting in the contamination of the transported fluid.

Given the circumstances, Guaymas contemplated reviewing three possible options for the replacement of this line. The piping options were: carbon steel, PE-X or stainless steel.

Pexgol Solution

Once the three aforementioned piping options were analyzed, Pexgol was chosen due to its high resistance to corrosive environments, impact resistance, and supply in long lengths.

Installation was quick and easy, in a single 150-meter section which was installed in approximately 4 hours, only 2 joints were made at the ends.

Estudos de Caso Relacionados

Pexgol Pipe for the Transport of Fluorosilicic Acid.

Fluorosilicic Acid Transport

Phosphate Mine – ICL Rotem
Israel

 | 

1995
Water Extraction From Deep Wells (150 Meters)

Water Extraction from Wells

Andacollo Mine
Chile

 | 

2015
Installation of Pexgol Pipes for Transporting Hot Water.

Hot Water Supply

Hilton
Israel

 | 

2020
O sistema de tubulação da Pexgol permitiu que a Nexa Resources renovasse seu processo de gerenciamento de resíduos, reduzindo significativamente o impacto ambiental.

Aprimorando a Gestão de Resíduos da Nexa Resources Usando Pexgol

Nexa Resources
Brasil

 | 

2023
Installation of a Drainage System between a Well and a Mining Dam.

Well Drainage at Mining Dam

CODELCO – El Teniente Mine
Chile

 | 

2019
Test Of Pexgol Pipes Vs Hdpe Pipes For Brine Transportation

Test: Pexgol vs HDPE for Brine Transportation

YBL
Bolivia

 | 

2017