Skip to content

Hot Water Supply

Installation of Pexgol Pipes for Transporting Hot Water.

Estudo de Caso Nº

92

Cliente

Hilton
Israel

|

2020

Condições de Trabalho

Temperature: 70°C – 85°C | Pressure: 6 bar

Solução Pexgol

Pexgol 16 mm – 32 mm class 24

Aplicação

Hot Water Transportation

Comprimento

Categorias

Installation of Pexgol Pipes for Transporting Hot Water.

The Challenge

As one of the largest, and most well-known hotels, the “Hilton” hotel, located in central Israel, is obligated to supply hot water completely free of corrosion-residuals. While historically metal pipes were used for high-rise buildings, metal piping systems tend to cause severe corrosion accumulation. Corrosion build up could lead to damaged pipes and malfunctioning valves, connectors, pumps etc.

Pexgol Solution

The client decided to install Pexgol piping system to bring in a perfect non-corrosion-over-time solution. Pexgol cross-linked polyethylene can withstand high-temperature and high-pressure environments and provide a reliable and stable solution.

Estudos de Caso Relacionados

Replacement of HDPE Pipe for Pexgol

Slurry Transportation

Tizapa Mine
Mexico

 | 

2015
Transportation of Bauxite Ore Slurry at 95°C / 203°F

Alumina Plant: Ore Slurry Transportation

Urals Alumina Plant – Rusal
Russia

 | 

2013
Installation of a Borehole with Pipe in Sections for Reduced Space.

Installation of Water Well in Reduced Space

Mekorot
Israel

 | 

2020
Pexgol Pipe for the Transport of Fluorosilicic Acid.

Fluorosilicic Acid Transport

Phosphate Mine – ICL Rotem
Israel

 | 

1995
Dry Gas Line for Pump Activation.

Dry Gas Transportation

ExxonMobil
Argentina

 | 

2020
Transportation of Phosphoric acid in a potassium nitrate plant

Transportation of Phosphoric Acid

Haifa Chemicals
Israel

 | 

1995