Skip to content

Abrasive Tailings Transport

Installation of Pexgol Pipe for the Transport of Abrasive Tailings.

Estudo de Caso Nº

83

Cliente

Pirquitas Mine
Argentina

|

2015

Condições de Trabalho

Temperature: ambient | Pressure: 3 bar

Solução Pexgol

Pexgol 180 mm (6″), class 15

Aplicação

Tailing transport

Comprimento

2 m

Categorias

Installation of Pexgol Pipe for the Transport of Abrasive Tailings.

The Challenge

Pirquitas Mine, located in the north of the Argentine territory, required the transportation of abrasive slurry composed of quartz, iron, tin, zinc and lead minerals in a 2 meter section. The old rubber coated steel pipe that was intended for that line had failed due to excess of abrasion.

The use of coated steel or plastic pipe was evaluated.

Pexgol Solution

The client finally decided to install a Pexgol pipe due to its low roughness index and strength against the abrasion presented by the fluid to be transported.

Pexgol is currently has been working 6 times more than the rubber lined steel pipe would have been. Both options were similar in cost.
For the installation, no special tools were needed as the joints were flanged. Only two joins were made.

Estudos de Caso Relacionados

Reduction of material build-up in brine and brine/acid lines

Mineral Processing – Brine Transportation

SQM,Pedro Valvidia Mine
Chile

 | 

2010
Water Transportation through Shafts

Open Cast Mine Dewatering

Agnico Eagle Pinos Altos Mine
Mexico

 | 

2017
Pexgol Pipe Installation for Open Pit Mine Drainage.

High Pressure Dewatering in Open Pit Mine

Lundin Mining
Chile

 | 

2021
Pipe installation on a mountain

Meltdown Water Transport

Codelco Andina, TADA 1-2 Project
Chile

 | 

2013
Pexgol Pipe Installation for the Transport of Water with Solids (Feathers, Bones, Viscera, Etc.)

Transportation of Water with Solids

Kofanor
Mexico

 | 

2022
Scale build up reduction - highly concentrated lime solution

Process Water – Brine Transportation

SQM Nueva Victoria-Iquique
Chile

 | 

2010