Well Drainage at Mining Dam

Installation of a Drainage System between a Well and a Mining Dam.

Estudo de Caso Nº

78

Cliente

CODELCO – El Teniente Mine
Chile

|

2019

Condições de Trabalho

Extreme temperatures -5° to 35°C / 25° to 95°F

Solução Pexgol

Pexgol 250 mm (10”), class 15

Aplicação

Dewatering

Comprimento

1620 m / 5314 ft

Categorias

Installation of a Drainage System between a Well and a Mining Dam.

The Challenge

The administration of the Carén reservoir, in the commune of Alhué (Chile), receives tailings from the El Teniente mine.

The western retaining wall of the reservoir needed to be widened by at least 30 meters. In order to do that a well had to be drained that was formed by leaks from the wall at its base. The extracted water had to be returned to the dam.
Also, the drainage work had to be done in just 20 days.

Pexgol Solution

The customer finally opted for Pexgol, despite the higher cost per meter, because the final cost of the installation, that only took one week, was widely offset against the installation of HDPE pipe that would have taken about a month and a half.

The advantage of Pexgol, in this solution, lies in the supply format in coils of long lengths, which made it possible to streamline its layout in the field, with no more than a dozen couplings, thus reducing assembly time.

In addition to the quick installation, technical assistance from the local team (Crosspipe Systems) was carried out with great agility and efficiency.
A total of 11 electrofusion fittings were installed.

Estudos de Caso Relacionados

Transportation of water in more than 150 mining crossroads

Water Transport on Crossroads

Doña Inés de Collahuasi SCM, Collahuasi Mine
Chile

 | 

2012
Optimization of Water Systems in the Energy Industry.

“Threading” Pexgol Pipes

Pluspetrol
Argentina

 | 

2023
Improving the efficiency of salmon farming with the superior solution of Pexgol pipes.

Pexgol’s Pipe Solution Enhances Salmon Farming

Mowi
Chile

 | 

2021
Installation of a Fire Supply Network in a Oil Treatment Plant.

Fire Network Supply

YPF
Argentina

 | 

2021
Replacement of a Drainage Line in an Underground Mine.

Drainage in Underground Mine

Atacama Kozan
Chile

 | 

2019
Adapting to the demands of the process: how Pexgol solves the problems of corrosion and abrasion in the extraction of palm oil.

Implementation of Pexgol Pipelines for the Transport of Muddy Water

IACSA
Colombia

 | 

2023