Alumina Plant: Ore Slurry Transportation
Transportation of Bauxite Ore Slurry at 95°C / 203°F
Estudo de Caso Nº
52
Cliente
Urals Alumina Plant – Rusal
Russia
|
2013
Condições de Trabalho
High temperature
Solução Pexgol
Pexgol 160 mm Class 15
Aplicação
Slurry Transportation
Comprimento
20 m
Categorias
The Challenge
At Urals Alumina Plant, they required to renovate their carbon steel pipes where they transport bauxite ore slurry at 95°C / 203°F. Every year these lines were suffering from sedimentation problems and it was necessary to clean them every three months, involving man power and high costs.
Pexgol Solution
The client decided to replace the carbon steel pipes with Pexgol pipes. Thanks to it smooth inner surface, sedimentation is not a problem and as a consequence requires less maintenance, lowering also costs.
The Pexgol pipes have been checked annually and even after 4,5 years of exploitation, the pipes have shown positive results. They don’t have to clean the pipes any more.
Estudos de Caso Relacionados
Improving efficiency in steel foundry with Pexgol
KSB de Mexico
Mexico
|
2023
From Steel to Pexgol: A Plumbing Upgrade for Tel Aviv’s Gordon Pool
Gordon Pool
Israel
|
2023