Water Supply & Fire Extinguisher Line

An Outdoor Hydrant and Indoor Sprinklers were installed at Guyana Airport

Estudo de Caso Nº

49

Cliente

Cheddi Jagan International Airport
Guyana

|

2018

Condições de Trabalho

Water: 6 bar | Hydrants: 12 bar Indoor | Sprinklers: 18 bar

Solução Pexgol

Pexgol 110, 125, 160 & 225 mm 32 Class 19

Aplicação

Water Supply & Fire Extinguisher Line

Comprimento

Categorias

The Challenge

Cheddi Jagan International Airport were going under renovations in order to expand their operations.
One of the main challenges for them was installing a fire extinguishing line all over the airport. The main concern for the engineering company (China Harbour) that was caring out the project was to find a suitable pipe line that required minimum maintenance, a material that can withstand hard installation conditions and minimum possible installation time, since this kind of lines usually requires a lot of work.

The other challenge was the installation of the water supply line. The conditions were also hard and they required a pipe in compliance with ASME standards.

Pexgol Solution

The Designer Engineer required China Harbour to install PE-x pipes for both lines.
Pexgol pipe systems was chosen due to its capabilities that allow the pipes to be drag on concrete, steel and all over the construction site making the installation efficient and fast. With other materials such as PE, tons of precautions to not damage should been necessary.
Pexgol pipes were also a great solution regarding possible water hammers caused by the hydrant trucks in case a fire develops, since the pipe can withstand them.

The pipes were connected with mechanical fittings, and they also didn’t required special treatment.
The installation with Pexgol pipes took x2.5 times less than any other material like PE. This pipes would have required special care to install the fittings, a much longer installation time and detailed supervision.
During the installation, local workers were trained on the field and complete the installation with great success.

Estudos de Caso Relacionados

Transport of acid slurry at high temperatures

Slurry Transportation

Moa Nickel S.A. Sherritt
Cuba

 | 

2012
Transportation of brackish water to the main pumping station

Water Lines – Harsh Conditions

Dead Sea Works
Israel

 | 

1993
Water line feed from wells to mine

Mine Dewatering – High Pressure Conditions

Antofagasta Minerals, Michilla Mine
Chile

 | 

2011
Pexgol Fittings for Brine Transportation at a Brazilian Chemical Company.

High Corrosion Resistance Against Brine

Unipar Carbocloro
Brazil

 | 

2019
Grey Water Transportation

Recovered Water Transportation

Coeur Mexicana S.A. de C.V. Palmarejo
Mexico

 | 

2017
Pexgol pipe was selected for the assembly of a muddy water transport line for a palm oil processing company.

Transport of Muddy Water for Palm Oil Extractor

Extractora Poligrow
Colombia

 | 

2022