Open Cast Mine Dewatering
Dewatering without Supports
Case Study Nº
37
Customer
El Volcan Mine Arcelor Mittal
Mexico
|
2017
Working Conditions
Pressure 189 psi; height difference 130 m; solids 15-20 %; fluid temperature 20-25°C.
Pexgol Pipes
Pexgol Class 15 160 x 14.6.
Application
Dewatering
Lenght
650 meters.
Categories
The Challenge
El Volcan Mine was facing a excess water that required dewatering. During rainy season the Mine area suffers from constant floods due to high level groundwater that wasn’t taken under consideration.
In addition, the client was looking for a quick and easy to install solution, since the pipe was going to be suspended, and a regular pipe will require supports.
Pexgol Solution
El Volcan Mine decided to replace their current 6” RD11 HDPE pipe for a Pexgol class 15 pipe 160 x 14.6 due to it quick and easy installation.
650 meters of Pexgol pipe was provided. The installation was done in a quick and efficient way, and count with Pexgol technical support during the whole process.
Related Case Studies
Well Drainage at Mining Dam
CODELCO – El Teniente Mine
Chile
|
2019
Cold Water Distribution for External Cooler System
Chip Manufacturer
Israel
|
2022
Underground Mine Dewatering
Codelco Chuquicamata
Chile
|
2017
Transportation of Alcohol for the Production of Rum and Brandy
Cuba Ron
Cuba
|
2016
Transport of Compressed Air
Meridian Mine – Faena El Peñón
Chile
|
2018