Transport of Lime Slurry

Transport Of Lime Slurry At 100°C

Estudo de Caso Nº

28

Cliente

Minas de Oro Nacional, Mulatos Mine
Mexico

|

2015

Condições de Trabalho

Extreme transportation temperature (100°C).

Solução Pexgol

Pexgol 90 mm (SDR 7.4).

Aplicação

Lime slurry transportation.

Comprimento

150 m.

Categorias

Transport Of Lime Slurry At 100°C

The Challenge

The client needed to transport lime slurry, which is highly fouling due to the high temperatures and the liquid consistency. The lime slurry was transported at 100°C, damaging all metals and plastics that were not resistant enough. The fouling caused a considerable diminution on the inside diameter of the former pipe, sometimes even closing it completely. Previously the client used to work with a rubber hose, but due to the extreme conditions, and the lack of a flat inside surface, it wasn’t enough to prevent the accumulation.

Pexgol Solution

Golan provided 50 meters of Pexgol 90 mm pipe (3” – SDR 7.4). The installation was easy due to the one section pipe, that didn’t require joints. The natural curve radio was utilized to pass all the obstacles during the installation. Pexgol pipes proved to be the best solution, thanks to it’s high resistant to abrasion, corrosion, encrustation and resistance to high temperatures.

The client saved costs; formerly the rubber hose cost 6 times more than Pexgol. In the other hand, the MTBF was just two month.

Since the Pexgol pipe installation no maintenance has been required, not even plant stops.

Estudos de Caso Relacionados

Water line feed from wells to mine

Water Lines – High Pressure Water Feed Lines

Yamana Gold, Meridian Mine
Chile

 | 

2012
Installation of a Drainage System in an Open Pit Mine.

Drainage System

BHP Pampa Norte – Cerro Colorado Mine
Chile

 | 

2020
An Outdoor Hydrant and Indoor Sprinklers were installed at Guyana Airport

Water Supply & Fire Extinguisher Line

Cheddi Jagan International Airport
Guyana

 | 

2018
In an engineering challenge, the Pexgol 225 mm (8”) Class 15 pipe proved to be the perfect solution for transporting tailings at the Mina Capela mining complex.

Environmental Protection and Efficiency in Tailings Management

Mina Capella - Grupo Peñoles
Mexico

 | 

2023
Replacement of Steel Pipes with Pexgol for Testing Centrifugal Pumps.

Pexgol for Centrifugal Pump Test

Flowserve
Argentina

 | 

2022
Transportation of water with solids from an open cast mine

Open Cast Mine Dewatering

Doña Inés de Collahuasi SCM, Collahuasi Mine
Chile

 | 

2013