Meltdown Water Transport
Pipe installation on a mountain
Estudo de Caso Nº
16
Cliente
Codelco Andina, TADA 1-2 Project
Chile
|
2013
Condições de Trabalho
Complex & harsh ground, 300 m altitude.
Solução Pexgol
Pexgol 315 mm, Class 15 (SDR 11).
Aplicação
Water transportation.
Comprimento
3,300 m.
Categorias

The Challenge
Codelco needed to transport meltdown water downhill at Andes Mountain range.
The water pipes installation was a big risk for the team, as well as huge workforce with short time schedules.
Pexgol Solution
Using hoses seemed to be the solution, but the complexity of its installation made the client decided to use Pexgol in long sections instead.
The installation was simplified by the use of Pexgol long sections.
The pipes were unrolled from it coils and jointed trough electro-fusion, to be dragged and mapped out according to the project.
The installation was done in perfect timing with an optimal performance.
Estudos de Caso Relacionados
High Pressure Drain in Underground Mine
Ojos del Salado Mine – Lundin Mining
Chile
|
2018
Efficient Choice: PE-X Pipe for the Palm Industry
Extractora Monterrey
Colombia
|
2023
Installation of Water Well in Reduced Space
Mekorot
Israel
|
2020