Skip to content

Mineral Processing Corrosive Liquid & Vapor

Transportation of mixed liquid and corrosive vapor (H2S) from the dehumidifiers

Estudo de Caso Nº

11

Cliente

Moa Nickel S.A. Sherritt
Cuba

|

2011

Condições de Trabalho

High corrosive liquid operating at 95°C/203°F.

Solução Pexgol

Pexgol 280 mm Class 10.

Aplicação

Dehumidifier water line.

Comprimento

800 meters.

Categorias

Mineral Processing Corrosive Liquid & Vapor

The Challenge

Cuba’s nickel reserves are among the largest in the world largest exports, making it essential to provide reliable and durable pipelines for the transportation of its minerals. Unfortunately, the high percentage of hydrogen sulfide in the hot water from the dehumidifiers over an extended period of time lends itself to high levels of corrosion and functional deterioration. Problems occurred from the beginning in previous installations, forcing work halts.

Before turning to Pexgol, our client tried an alternative piping solution without success: Carbon steel rubber lined (CSRL) – which proved to be damaged by weather conditions as well as suffer from extensive problems of corrosion around the welds due to lack of rubber. Such high levels of corrosion can also lead to a potential reduction of hydraulic capacity.

Pexgol Solution

A Pexgol 280 mm class 10 pipe with electrofusion couplers surrounded by steel reinforcements was installed, enabling durability under very high temperatures.

Several months since the installation of Pexgol, the system operates without any problems, it resulted more cost-effective per meter and had lower installation costs. As a result of the new installation, the line hydraulic capacity increased beyond the maximum expected values by the operations managers.

Estudos de Caso Relacionados

Pexgol Pipe to Transport Effluents at 30°C / 86°F in an Underground Mine.

Pumping Mining Effluents

AngloGold Ashanti
Brazil

 | 

2019
Water Drainage in Harsh Ground

Water Drainage at an Open-Cast Mine

Timmins Gold Corp Group, Molimentales del Noroeste Mine
Mexico

 | 

2016
Adapting to the demands of the process: how Pexgol solves the problems of corrosion and abrasion in the extraction of palm oil.

Implementation of Pexgol Pipelines for the Transport of Muddy Water

IACSA
Colombia

 | 

2023
Pexgol Pipe for the Transport of Fluorosilicic Acid.

Fluorosilicic Acid Transport

Phosphate Mine – ICL Rotem
Israel

 | 

1995
Reduction of material build-up in brine and brine/acid lines

Mineral Processing – Brine Transportation

SQM,Pedro Valvidia Mine
Chile

 | 

2010
Water line feed from wells to mine

Water Lines – High Pressure Water Feed Lines

Yamana Gold, Meridian Mine
Chile

 | 

2012