“Threading” Pexgol Pipes

Optimization of Water Systems in the Energy Industry.

Caso de Estudio Nº

160

Cliente

Pluspetrol
Argentina

|

2023

Condiciones Operativas:

Temperature: 20°C / 68°F | Pressure: 10 kg/cm²

Tuberías Utilizadas:

Pexgol 160 mm, class 15

Uso:

Aqueduct

Largo:

850 m / 2788 ft

Categorías:

“Threading” Pexgol Pipes

The Challenge

Pluspetrol, an international company with extensive experience in oil and gas exploration and production, faced a significant problem with one of its water pipelines in Argentina. The existing carbon steel pipe, used to transport fresh water, showed evident signs of wear due to corrosion and blockages caused by scaling, compromising the efficiency and safety of the water distribution system.

The Solution

To address these issues, Pluspetrol decided to replace the existing pipe with 160 mm, class 15 Pexgol pipe, extending over 850 meters. Pexgol was chosen due to its high resistance to corrosion and its ability to resist scaling, in addition to its lightness and ease of handling, which allow for quick transport and installation.

The installation of the new pipe was carried out over a period of two weeks. During this time, a specialized procedure was developed to integrate the Pexgol pipe within the existing steel structure every 220 meters. A specific tool was
designed to advance and dismantle blockages caused by scaling, working in coordination with the municipality to ensure compliance with all necessary permits.

The implementation of the Pexgol piping system in Pluspetrol’s aqueduct offered multiple benefits. The rapid installation and flexibility of the material allowed for efficient integration without significantly disrupting daily
operations. Pexgol pipe, known for its durability and corrosion resistance, promises a long lifespan and a notable reduction in maintenance costs.

Additionally, the use of connections such as the double mechanical connector and flanged coupling ensured a safe and effective installation, adapted to the technical demands of the project.

Casos de Estudio Relacionados

Pexgol’s Piping Solution for Regal Petroleum.

Superando los Desafíos de Tuberías en el Transporte de Hidrocarburos

Regal Petroleum Corporation
Ucrania

 | 

2023
Transporte de Alcohol Concentrado al 86% para la Producción de Ron y Aguardiente

Transporte de Alcohol para Producción de Ron y Aguardiente

Cuba Ron
Cuba

 | 

2016
Instalación de un Sistema de Drenaje en una Mina de Rajo Abierto.

Sistema de Drenaje

BHP Pampa Norte – Mina Cerro Colorado
Chile

 | 

2020
Transporte de Salmuera con Contenido de Sulfato

Transporte de Salmuera

SQM,Pedro Valvidia Mine
Chile

 | 

2010
Transporte de Agua en más de 150 Cruces de Caminos Mineros

Transporte de Agua en Cruces de Caminos

Doña Inés de Collahuasi SCM, Collahuasi Mine
Chile

 | 

2012
Profertil and the Adaptation to New Chemical Processes with Pexgol.

Efficient Implementation of NaOH Drainage Systems

Pluspetrol
Argentina

 | 

2023