Skip to content

Pexgol’s Solution in Secondary Recovery for EMESA

EMESA Optimizes Formation Water Transportation in Mendoza.

Caso de Estudio Nº

164

Cliente

EMESA
Argentina

|

2023

Condiciones Operativas:

Temperature: 40° / 104°F | Flow: 100 m³/d | Pressure: 30 kg/cm² | Fluid components: Formation water

Tuberías Utilizadas:

Pexgol 90 mm class 15; 90 mm class 24 & 110 mm class 30

Uso:

Secondary Recovery

Largo:

700 m / 2296.59 ft

Categorías:

Pexgol’s Solution in Secondary Recovery for EMESA

The Challenge

EMESA, an energy company in the province of Mendoza (Argentina) that participates in some hydrocarbon projects in the province in collaboration with private operators, faced the need to establish a new line for secondary recovery. The project involved transporting formation water from a well with mechanical pumping (AIB) to a tank, operating at a temperature of 40°C, a flow rate of 100 m³/h, and a pressure of 30 kg/cm².

The Solution

To meet the operational requirements of the project, EMESA decided to implement 90 mm class 15, 90 mm class 24, and 110 mm class 30 Pexgol pipes, covering a total length of 700 meters. Pexgol pipes were selected due to their quick installation, material flexibility, lightness, and ease of handling, as well as their ability to supply long sections that simplify the installation process.

The installation of the Pexgol pipes was efficiently carried out in a single day by unrolling the pipes and using double mechanical connectors and flanged couplings. This process was not only fast but also notable for the minimal time required for the installation of mechanical fittings. Pexgol’s ability to handle high pressures and temperatures,
along with its corrosion resistance, ensured reliable and long-lasting operation.

EMESA’s positive experience with Pexgol underscores the importance of choosing high-quality and resistant materials for critical applications in the energy sector

Casos de Estudio Relacionados

Transporte de Agua de Pozo con Bajo pH.

Transporte de Agua en Fábrica Textil

CMT La Laguna
México

 | 

2018
Reemplazo de Tubería de Acero al Carbón por Pexgol

Transporte de Agua

Cargill
México

 | 

2017
Transporte de Salmuera desde el Mar Muerto hasta la Estación Principal de Bombeo

Trasporte de Salmuera en Condiciones Extremas

Dead Sea Works
Israel

 | 

1993
Cómo la tubería Pexgol mejoró la infraestructura de la red contra incendios en una planta de pinturas.

Tuberías Pexgol para la Ampliación de Red contra Incendios

Wall
Argentina

 | 

2023
Transforming water transportation with Pexgol technology

Pexgol’s Solution for CFE: A Leap in Durability and Efficiency

Comisión Federal de Electricidad
Mexico

 | 

2023
Reemplazo de una Línea de Drenaje en una Mina Subterránea.

Drenaje en Mina Subterránea

Atacama Kozan
Chile

 | 

2019