Efficient Choice: PE-X Pipe for the Palm Industry

Pexgol pipe was selected for the Assembly of a Muddy Water Transport Line for a Palm Oil Processing Company.

Caso de Estudio Nº

120

Cliente

Extractora Monterrey
Colombia

|

2023

Condiciones Operativas:

Flow: 50 m3/h | Temperature: 80°C / 176°F

Tuberías Utilizadas:

Pexgol 110 mm (4″), class 15

Uso:

Muddy water transport

Largo:

200 m / 656 ft

Categorías:

The Challenge

The agroindustrial Colombian company Extractora Monterrey S A S is dedicated to the cultivation and processing of palm fruit, for the extraction of crude oil, palm kernel oil and palm kernel cake. It required the installation of a new line to transport muddy water to the oxidation ponds. From the Florentine passing the main road and the plantation, the excavation and installation of the pipe would be carried out in the crop, between palm trees without causing damage to the plants and the irrigation pipe.

Pexgol Solution

In this case, PE-X pipes were chosen because they are cheaper compared to the installation of stainless steel pipes.

Another factor that influenced the decision to use PE-X pipes was its ease of installation. The installation process was quick and easy, allowing the 200 meters of pipe to be laid in just 4 hours, using only two 15/16 wrenches, a level and a GP mechanical union.

In addition, PE-X pipes have fewer joints, which reduces the risk of leaks and therefore increases efficiency in transporting palm oil.

Finally, the recommendation of another client who had used PE-X pipes in other projects with good results also influenced the decision to use this type of pipe in the installation.

In summary, the choice of PE-X pipes in the transport of slurry water is due to its lower cost compared to stainless steel pipes, its ease of installation, fewer joints, recommendation from other clients and the speed of delivery. placement, which reduced the time and number of personnel required for installation.

Casos de Estudio Relacionados

Transporte de agua a alta presión para tajo sur en minera de cobre y zinc.

Dewatering a Alta Presión

Minera Antapaccay
Perú

 | 

2023
Instalación de un Sistema de Drenaje entre Tranques en una Mina de Cobre.

Transporte de Agua entre Tranques

CODELCO – Mina El Teniente
Chile

 | 

2019
La mejora del desagüe en minera Media Luna con Pexgol.

Superando Desafíos Geotécnicos con Pexgol en Media Luna

Minera Media Luna
México

 | 

2023
Reducción del desgaste y aumento de la durabilidad en el proceso de limpieza de arena en KSB de México.

Mejorando la Eficiencia en la Fundición de Acero con Pexgol

KSB de Mexico
México

 | 

2023
Reemplazo de Tuberías de Acero al Carbono por Pexgol para Red Contra Incendios.

Transporte de Agua para Red Contra Incendios

Profertil
Argentina

 | 

2022
La tecnología de Pexgol puede superar los desafíos en aplicaciones de pozos poco profundos, ofreciendo una solución eficiente y rentable para empresas líderes en la industria agrícola.

Éxito en Desalinización Agrícola: Desafíos de Suministro de Agua

BerryMex
México

 | 

2019