Efficient Choice: PE-X Pipe for the Palm Industry

Pexgol pipe was selected for the Assembly of a Muddy Water Transport Line for a Palm Oil Processing Company.

Caso de Estudio Nº

120

Cliente

Extractora Monterrey
Colombia

|

2023

Condiciones Operativas:

Flow: 50 m3/h | Temperature: 80°C / 176°F

Tuberías Utilizadas:

Pexgol 110 mm (4″), class 15

Uso:

Muddy water transport

Largo:

200 m / 656 ft

Categorías:

The Challenge

The agroindustrial Colombian company Extractora Monterrey S A S is dedicated to the cultivation and processing of palm fruit, for the extraction of crude oil, palm kernel oil and palm kernel cake. It required the installation of a new line to transport muddy water to the oxidation ponds. From the Florentine passing the main road and the plantation, the excavation and installation of the pipe would be carried out in the crop, between palm trees without causing damage to the plants and the irrigation pipe.

Pexgol Solution

In this case, PE-X pipes were chosen because they are cheaper compared to the installation of stainless steel pipes.

Another factor that influenced the decision to use PE-X pipes was its ease of installation. The installation process was quick and easy, allowing the 200 meters of pipe to be laid in just 4 hours, using only two 15/16 wrenches, a level and a GP mechanical union.

In addition, PE-X pipes have fewer joints, which reduces the risk of leaks and therefore increases efficiency in transporting palm oil.

Finally, the recommendation of another client who had used PE-X pipes in other projects with good results also influenced the decision to use this type of pipe in the installation.

In summary, the choice of PE-X pipes in the transport of slurry water is due to its lower cost compared to stainless steel pipes, its ease of installation, fewer joints, recommendation from other clients and the speed of delivery. placement, which reduced the time and number of personnel required for installation.

Casos de Estudio Relacionados

Transporte de Salmuera desde el Mar Muerto hasta la Estación Principal de Bombeo

Trasporte de Salmuera en Condiciones Extremas

Dead Sea Works
Israel

 | 

1993
Asegurando el futuro de la minería de oro: Newmont Corporation opta por Pexgol para el transporte de agua

Avanzando hacia Operaciones Mineras más Seguras y Eficientes

Newmont Corporation
Argentina

 | 

2018
850 metros de tubería reemplazados en menos de 24 horas, sin afectar a los residentes.

Adiós al Asbesto: Pexgol moderniza red de agua termal

Raquet Club Lake Chapala
México

 | 

2024
Una maniobra de alta precisión logró el montaje completo del sistema en tiempo récord, garantizando seguridad y continuidad operativa.

Pexgol supera las condiciones extremas del dewatering en La Ciénega

Fresnillo Plc.
México

 | 

2025
Transporte de Agua a Alta Presión para Mina de Oro.

Transporte de Agua a Alta Presión

Minera Mansfield
Argentina

 | 

2019
Instalación de Tuberías Pexgol para Suministro de Agua Potable de Cloro Libre.

Suministro de Agua Potable con Cloro Libre

Rabin Medical Center
Israel

 | 

2020