Efficient Choice: PE-X Pipe for the Palm Industry

Pexgol pipe was selected for the Assembly of a Muddy Water Transport Line for a Palm Oil Processing Company.

Caso de Estudio Nº

120

Cliente

Extractora Monterrey
Colombia

|

2023

Condiciones Operativas:

Flow: 50 m3/h | Temperature: 80°C / 176°F

Tuberías Utilizadas:

Pexgol 110 mm (4″), class 15

Uso:

Muddy water transport

Largo:

200 m / 656 ft

Categorías:

The Challenge

The agroindustrial Colombian company Extractora Monterrey S A S is dedicated to the cultivation and processing of palm fruit, for the extraction of crude oil, palm kernel oil and palm kernel cake. It required the installation of a new line to transport muddy water to the oxidation ponds. From the Florentine passing the main road and the plantation, the excavation and installation of the pipe would be carried out in the crop, between palm trees without causing damage to the plants and the irrigation pipe.

Pexgol Solution

In this case, PE-X pipes were chosen because they are cheaper compared to the installation of stainless steel pipes.

Another factor that influenced the decision to use PE-X pipes was its ease of installation. The installation process was quick and easy, allowing the 200 meters of pipe to be laid in just 4 hours, using only two 15/16 wrenches, a level and a GP mechanical union.

In addition, PE-X pipes have fewer joints, which reduces the risk of leaks and therefore increases efficiency in transporting palm oil.

Finally, the recommendation of another client who had used PE-X pipes in other projects with good results also influenced the decision to use this type of pipe in the installation.

In summary, the choice of PE-X pipes in the transport of slurry water is due to its lower cost compared to stainless steel pipes, its ease of installation, fewer joints, recommendation from other clients and the speed of delivery. placement, which reduced the time and number of personnel required for installation.

Casos de Estudio Relacionados

Instalación de Tubería Pexgol en Planta de Producción de Procesamiento de Pescado.

Transporte de Aceite de Pescado a 36°C

Guaymas Protein Company
México

 | 

2018
Instalación de un Sistema de Drenaje en una Mina de Rajo Abierto.

Sistema de Drenaje

BHP Pampa Norte – Mina Cerro Colorado
Chile

 | 

2020
Profertil y la Adaptación a Nuevos Procesos Químicos con Pexgol.

Implementación Eficiente de Sistemas de Desagüe para NaOH

Pluspetrol
Argentina

 | 

2023
Reemplazo de una Línea de Drenaje en una Mina Subterránea.

Drenaje en Mina Subterránea

Atacama Kozan
Chile

 | 

2019
Evaluación de la performance del revestimiento Pexgol en condiciones de servicio extremo.

Solución duradera para la abrasión enbaterías de producción: Pexgol en YPF

YPF
Argentina

 | 

2018
Transporte de Agua a través de Robbins

Desagüe de Tajo Minero

Agnico Eagle Mina Pinos Altos
México

 | 

2017