Aconcagua Energía Implements Pexgol Solutions for Efficiency and Savings

Transformation in the logistics of formation water.

Caso de Estudio Nº

158

Cliente

Aconcagua Energía
Argentina

|

2023

Condiciones Operativas:

Temperature: 35°C / 95°F | Flow: 80 m³/h | Pressure: 10 kg/m

Tuberías Utilizadas:

Pexgol 90 mm class 15 & 110 mm class 24

Uso:

Injection water transport

Largo:

10,000 m / 32808.4 ft

Categorías:

Aconcagua Energía Implements Pexgol Solutions for Efficiency and Savings

The Challenge

Aconcagua Energía, a prominent independent energy company in Argentina, faced significant challenges in transporting injection water, crucial for its oil operations. Traditionally, formation water was transported by trucks from the treatment plant to the elevated tanks, which not only represented a high operational cost but also involved risks associated with transport and logistical difficulties, especially during adverse weather conditions or certain times of the year. The need for a more efficient, safe, and economical solution was evident.

The Solution

In search of improving operational efficiency and reducing costs, Aconcagua Energía opted for the implementation of an innovative pipeline using 90 and 110 mm Pexgol for a total of 10,000 meters. The choice of Pexgol was due to its recognized advantages in terms of installation speed, material flexibility, lightness and ease of handling, as well as the ability to transport in rolls, which greatly simplified logistics on the ground.
The installation was carried out in stages, minimizing assembly times and optimizing the resources used. Mechanical double connectors and flanged couplings were used, facilitating a safe and efficient integration into the existing system.

The project not only eliminated the dependency on truck transportation but also brought tangible benefits in terms of operational costs and associated risks. The first phase of the installation included the assistance and training of Argpex in unrolling techniques and the use of mechanical connectors. For the later stages, the Aconcagua Energía team was able to carry out the installation autonomously, demonstrating the effectiveness and ease of implementation of the Pexgol system.

Casos de Estudio Relacionados

High-pressure water transport for the Southern Pit in a copper and zinc mine.

High-pressure fluid transport

Minera Antapaccay
Peru

 | 

2023
Transporte de Agua con Partículas de Sulfuro y Cobalto en Suspención

Transporte de Agua y Sulfuro

Moa Nickel S.A. Sherritt
Cuba

 | 

2015
Instalación de Tuberías Colgantes Pexgol en Mina Subterránea

Drenaje de agua de mina subterránea

Codelco Chuquicamata
Chile

 | 

2017
Inyección de Lechada de Cemento a una Mina Subterránea

Transporte de Lechada de Cemento

Mina Aguilar
Argentina

 | 

2015
Línea de Transporte desde los Espesadores a Tanques de la Planta de Neutralización

Transporte de Material Corrosivo

Moa Nickel S.A. Sherritt
Cuba

 | 

2015
Elevando la eficiencia y durabilidad en la construcción de tuberías aéreas.

Enfrentando los Desafíos del Terreno de Neuquén en Argentina

Pluspetrol
Argentina

 | 

2023