Transporte de Agua a Alta Presión

Transporte de Agua a Alta Presión para Mina de Oro.

Caso de Estudio Nº

86

Cliente

Minera Mansfield
Argentina

|

2019

Condiciones Operativas:

Tubería expuesta con sistemas de rebombeo de 21 bar (305 PSI)

Tuberías Utilizadas:

Pexgol 225 mm (8″), clase 24, 19, 15 & 12

Uso:

Transporte de agua

Largo:

12.5 km

Categorías:

The Challenge

The engineering company SAXUM had the challenge of designing the main water supply line for Mansfield’s “Lindero Gold Mine” project, which through heap leaching removes and processes mineral.

Given the differences in height (more than 300 meters in total) and the length, a pipe was required that would provide safety to work with high pressures and that can be exposed to the sun without the need to bury it.

Due to the climatic conditions of the area, with low temperatures and strong winds, added to the height (above 4000 m above sea level), a simple and quick solution to install was sought, since otherwise the costs of assembly would be very high.

Pexgol Solution

It was decided to install Pexgol since it is supplied in coils, in this case up to 280 meters in length. Compared to steel and HDPE supplied in 12 or 14 meter lengths, this supply format kept labor and the posibility of failure to a minimum.

Approximately 1,400 meters were installed per day with only three operators and a backhoe. The connections were made by electrofusion couplings.

Casos de Estudio Relacionados

Una instalación en dos fases para el suministro y retorno de agua caliente a alta temperatura

Escalando la eficiencia: Energía Distrital en Penn State Harrisburg

Penn State University - Harrisburg
USA

 | 

2021
Instalación de 3000 Metros de Tubería PE-X para una Mina Subterránea.

Líneas de Desagüe en Mina Subterránea

Lundin Mining – Mina Candelaria Norte
Chile

 | 

2020
Reemplazo de una Tubería HDPE por Pexgol

Transporte de Aire Comprimido

Minera Saucito S.A. de C.V.
México

 | 

2017
Cómo Pexgol aceleró el suministro y la instalación de una línea crítica en Madagascar.

Solución Integral para Transporte de Agua en Proyectos Urgentes

Madagascar Mining
Madagascar

 | 

2024
Tuberías Pexgol: Resolviendo desafíos de instalación, manejo y flexibilidad en la Mina Cerro Negro

Agilizando el desagüe y transporte de agua con las tuberías Pexgol

Newmont
Argentina

 | 

2022
Instalación de 1000 Metros de Tubería PE-X para una Mina Subterránea.

Líneas de Desagüe Minero

Lundin Mining – Mina Alcaparosa
Chile

 | 

2019