Transporte de Agua a Alta Presión

Transporte de Agua a Alta Presión para Mina de Oro.

Caso de Estudio Nº

86

Cliente

Minera Mansfield
Argentina

|

2019

Condiciones Operativas:

Tubería expuesta con sistemas de rebombeo de 21 bar (305 PSI)

Tuberías Utilizadas:

Pexgol 225 mm (8″), clase 24, 19, 15 & 12

Uso:

Transporte de agua

Largo:

12.5 km

Categorías:

The Challenge

The engineering company SAXUM had the challenge of designing the main water supply line for Mansfield’s “Lindero Gold Mine” project, which through heap leaching removes and processes mineral.

Given the differences in height (more than 300 meters in total) and the length, a pipe was required that would provide safety to work with high pressures and that can be exposed to the sun without the need to bury it.

Due to the climatic conditions of the area, with low temperatures and strong winds, added to the height (above 4000 m above sea level), a simple and quick solution to install was sought, since otherwise the costs of assembly would be very high.

Pexgol Solution

It was decided to install Pexgol since it is supplied in coils, in this case up to 280 meters in length. Compared to steel and HDPE supplied in 12 or 14 meter lengths, this supply format kept labor and the posibility of failure to a minimum.

Approximately 1,400 meters were installed per day with only three operators and a backhoe. The connections were made by electrofusion couplings.

Casos de Estudio Relacionados

Transporte de Agua de Formación con Hidrocarburos.

Transporte de Agua de Formación

ROCH
Argentina

 | 

2015
Implementación de Pexgol para el Transporte de Pasta.

Pexgol facilita el transporte de pasta en la Mina Buriticá

Zijin - Continental Gold
Colombia

 | 

2023
Instalación de un Sistema de Drenaje entre Tranques en una Mina de Cobre.

Transporte de Agua entre Tranques

CODELCO – Mina El Teniente
Chile

 | 

2019
Transporte de Alcohol Concentrado al 86% para la Producción de Ron y Aguardiente

Transporte de Alcohol para Producción de Ron y Aguardiente

Cuba Ron
Cuba

 | 

2016
Sustitución de Acero por Tuberías de PE-X para Transporte de Agua Procesada.

Sustitución de Tubos de Acero por PE-X

Rosebel Gold Mines – IamGold
Surinam

 | 

2020
Minas Argentinas reemplaza HDPE por Pexgol en su proyecto de lixiviación secundaria.

Riego eficiente y seguro en lixiviación secundaria con Pexgol

Minas Argentinas S.A.
Argentina

 | 

2025