Efficient Choice: PE-X Pipe for the Palm Industry

Pexgol pipe was selected for the Assembly of a Muddy Water Transport Line for a Palm Oil Processing Company.

Caso de Estudio Nº

120

Cliente

Extractora Monterrey
Colombia

|

2023

Condiciones Operativas:

Flow: 50 m3/h | Temperature: 80°C / 176°F

Tuberías Utilizadas:

Pexgol 110 mm (4″), class 15

Uso:

Muddy water transport

Largo:

200 m / 656 ft

Categorías:

The Challenge

The agroindustrial Colombian company Extractora Monterrey S A S is dedicated to the cultivation and processing of palm fruit, for the extraction of crude oil, palm kernel oil and palm kernel cake. It required the installation of a new line to transport muddy water to the oxidation ponds. From the Florentine passing the main road and the plantation, the excavation and installation of the pipe would be carried out in the crop, between palm trees without causing damage to the plants and the irrigation pipe.

Pexgol Solution

In this case, PE-X pipes were chosen because they are cheaper compared to the installation of stainless steel pipes.

Another factor that influenced the decision to use PE-X pipes was its ease of installation. The installation process was quick and easy, allowing the 200 meters of pipe to be laid in just 4 hours, using only two 15/16 wrenches, a level and a GP mechanical union.

In addition, PE-X pipes have fewer joints, which reduces the risk of leaks and therefore increases efficiency in transporting palm oil.

Finally, the recommendation of another client who had used PE-X pipes in other projects with good results also influenced the decision to use this type of pipe in the installation.

In summary, the choice of PE-X pipes in the transport of slurry water is due to its lower cost compared to stainless steel pipes, its ease of installation, fewer joints, recommendation from other clients and the speed of delivery. placement, which reduced the time and number of personnel required for installation.

Casos de Estudio Relacionados

Transporte de Agua de Pozo con Bajo pH.

Transporte de Agua en Fábrica Textil

CMT La Laguna
México

 | 

2018
Transporte de Agua Excedente de Lluvia en una Mina

Desagüe de Tajo Minero

Mina El Volcan Arcelor Mittal
México

 | 

2017
En un desafío de ingeniería, la tubería Pexgol 225 mm (8”) Clase 15 demostró ser la solución perfecta para el transporte de relaves en el complejo minero Mina Capela.

Protección del Medio Ambiente y Eficiencia en el Manejo de Relaves

Mina Capella - Grupo Peñoles
México

 | 

2023
Pexgol ayudó a Profertil a superar el desafío de la corrosión en su red de protección contra incendios

De Acero al Carbono a Pexgol: Una Victoria contra la Corrosión

Profertil
Argentina

 | 

2021
Transporte de Salmuera con Contenido de Cal a las Pozas de Evaporación Solar

Transporte de Salmuera con Cal

SQM Nueva Victoria-Iquique
Chile

 | 

2010
Tuberías Pexgol: Resolviendo desafíos de instalación, manejo y flexibilidad en la Mina Cerro Negro

Agilizando el desagüe y transporte de agua con las tuberías Pexgol

Newmont
Argentina

 | 

2022