Water Lines – Harsh Conditions

Transportation of brackish water to the main pumping station

Case Study Nº

9

Customer

Dead Sea Works
Israel

|

1993

Working Conditions

Over 20 years of direct sunlight (UV) exposure. Ambient temperature variation from 47°C to -5°C (116°F to 23°F). Rock build-up from seasonal floods.

Pexgol Pipes

Pexgol ѓ355 Class 10 (SDR 16.2).

Application

Brackish water transportation.

Lenght

120 meters.

Categories

Water Lines - Harsh Conditions

The Challenge

The Rahaf dry riverbed has several powerful seasonal floods every year, causing heavy rocks and soil to drift and swipe everything in its way.

In order to transport water to the main pumping station, which supplied water from the sea to the plant, Dead Sea Works had to lay a waterline of 100 meters across the Rahaf dry riverbed.

Original asbestos pipe laid in a trench crossing the riverbed but the floods uncovered the pipe and damaged it, requiring the replacement of the pipe.

Pexgol Solution

A Pexgol ѓ355 Class 10 (SDR 16.2) pipe was laid in a ditch across the riverbed, without sand embedding.

The original pipe was made from combined short sections that required a complex installation and reinforced foundations. The Mean Time Between Failures (MTBF) was two years.

Since the easy installation of the Pexgol pipe in 1993, it has been working with no failures.

Related Case Studies

Replacement of Titanium Pipes by Pexgol Pipes to Transport Acid Solution.

Process Plant: Transport of Leached Slurry

Barrick Gold – Pueblo Viejo
Dominican Republic

 | 

2018
Grey Water Transportation

Recovered Water Transportation

Coeur Mexicana S.A. de C.V. Palmarejo
Mexico

 | 

2017
Replacement of HDPE Pipe for Pexgol

Slurry Transportation

Tizapa Mine
Mexico

 | 

2015
Installation of Pexgol Pipe for Transportation of Mining Tailings.

Tailings Transport with 50% solids

Golden Resource Corp. – Don David Gold Mine
Mexico

 | 

2019
Replacement of HDPE Pipes For Pe-X to Transport Industrial Treated Water.

Industrial Waste Water to MBR Treatment Facility

Chip Manufacturer
Israel

 | 

2021
Installation Oof Pexgol Pipes through a Chimney for Compressed Air.

Transport of Compressed Air for Underground Mine

HMC Gold
Chile

 | 

2021