Working Conditions

Fluid: process water with solids (feathers, bones, viscera, etc.) | Temperature: 26°C / 78°F | Gravity transport

Pexgol Pipes

Pexgol 6”, class 11

Application

Transport of process water with solids

Lenght

160 m / 524 ft

Categories

Pexgol Pipe Installation for the Transport of Water with Solids (Feathers, Bones, Viscera, Etc.)

The Challenge

Kofanor, a Mexican industrial company dedicated to the transformation of meat waste into flour and oil through a thermal process, resulting in a protein ingredient for the manufacture of animal feed.

Kofanor was looking to install an underground line to transport process water from a manhole to a sump. Two options were contemplated for this project, carbon steel or stainless steel pipes, however the first one was not an option due to the corrosion that they present over time, and stainless steel resulted in a very high operating cost.

Pexgol Solution

It was decided to use Pexgol due to the great facility to carry out the installation, where no joint or sand bed was required for the 140 meters of route where the pipe would be buried. Pexgol was cheaper compared to carbon steel and stainless steel.

Likewise, no special equipment was required to carry out the installation, since the plant had a backhoe and forklift with which they were able to uncoil the pipe without any problem.

Related Case Studies

Installation of a Drainage System in an Open Pit Mine.

Drainage System

BHP Pampa Norte – Cerro Colorado Mine
Chile

 | 

2020
Replacement of Titanium Pipes by Pexgol Pipes to Transport Acid Solution.

Process Plant: Transport of Leached Slurry

Barrick Gold – Pueblo Viejo
Dominican Republic

 | 

2018
Enhancing Efficiency and Durability in the Construction of Aerial Pipelines.

Facing the Challenges of the Neuquén Terrain in Argentina

Pluspetrol
Argentina

 | 

2023
Installation Oof Pexgol Pipes through a Chimney for Compressed Air.

Transport of Compressed Air for Underground Mine

HMC Gold
Chile

 | 

2021
Reduction of material build-up in brine and brine/acid lines

Mineral Processing – Brine Transportation

SQM,Pedro Valvidia Mine
Chile

 | 

2010
Transport Of Palm Oil Slurry At 95°C.

Transport of Palm Oil Slurry

Loma Fresca
Colombia

 | 

2017