Transition to Corrosion-Free Diesel Delivery Systems

Pexgol’s Role in Enhancing Guaymas Protein’s Operations.

Case Study Nº

155

Customer

Guaymas Protein
Mexico

|

2023

Working Conditions

Temperature: 30°C / 86°F | Pressure: 5kg

Pexgol Pipes

Pexgol 80 mm (3″), SDR 11

Application

Diesel transport

Lenght

100 m / 328 ft

Categories

Transition to Corrosion-Free Diesel Delivery Systems

The Challenge

Guaymas Protein, a leader in fish-based protein products, faced significant issues with its existing carbon steel pipelines used for diesel transport. The prevalent saline environment in the area led to recurring corrosion of the pipes, resulting in frequent maintenance and replacements to prevent leaks and environmental contamination.

The Solution

By choosing Pexgol’s 3” RD 11 pipes, Guaymas Protein found an effective solution to its corrosion problems. Pexgol pipes, with their superior chemical and corrosion resistance, provided a durable alternative to carbon steel. The flanged coupling used in the installation facilitated a smooth transition, utilizing the existing supports on-site for a quick and simple setup. The lightweight and flexible nature of Pexgol pipes, along with their ability to be delivered in long lengths, significantly sped up the installation process and reduced the need for frequent maintenance, offering a sustainable and efficient system for diesel transportation.

Related Case Studies

Pexgol Pipe Installation for the Transport of Cyanide Water.

Transport of Cyanide Water

Equinox Gold
Mexico

 | 

2022
Water line feed from wells to mine

Mine Dewatering – High Pressure Conditions

Antofagasta Minerals, Michilla Mine
Chile

 | 

2011
Hot sylvinite leach at 114°C/237°F

Mineral Processing – Potash Processing Plant

ICL group, Dead Sea Works
Israel

 | 

1987
In an engineering challenge, the Pexgol 225 mm (8”) Class 15 pipe proved to be the perfect solution for transporting tailings at the Mina Capela mining complex.

Environmental Protection and Efficiency in Tailings Management

Mina Capella - Grupo Peñoles
Mexico

 | 

2023
Water Extraction From Deep Wells (150 Meters)

Water Extraction from Wells

Andacollo Mine
Chile

 | 

2015
Transport Of Palm Oil Slurry At 95°C.

Transport of Palm Oil Slurry

Loma Fresca
Colombia

 | 

2017