Slurry Transportation
Replacement of a HDPE Pipe for a Pexgol Pipe
Case Study Nº
40
Customer
|
Working Conditions
Pexgol Pipes
Application
Lenght
Categories

The Challenge
The client required to replace their current HDPE pipe lines where they transported slurry since they have frequent wear and leak issues on the joints. They used thermo-fusion welding, plus reinforcement with a Vitaulic 995 coupler. This sort of situation involved a considerable expense every time they failed, but they didn’t last long. The failures were every 3 to 4 months.
Pexgol Solution
In order to perform a better job when transporting slurry, the client decided to install a Pexgol pipe of 1642 meters SDR 15 225 x 20.4.
Thanks to Pexgol’s comprehensive piping solution, abrasion issues were avoided, since its cross-linked material is between 4 to 10 times more resistant than other pipes materials.
The pipes were supplied n sections up to 240 meters each one, consequently the installation was simple improving the process’s security and therefore protecting the environment.
Related Case Studies
High Pressure Dewatering in Open Pit Mine
|
Open Cast Mine Dewatering
|
From Steel to Pexgol: A Plumbing Upgrade for Tel Aviv’s Gordon Pool
|
Alumina Plant: Ore Slurry Transportation
|
Water Supply & Fire Extinguisher Line
|
Pexgol for Centrifugal Pump Test
|