Skip to content

Slurry Transportation

Transport of acid slurry at high temperatures

Case Study Nº

12

Customer

Moa Nickel S.A. Sherritt
Cuba

|

2012

Working Conditions

Highly abrasive liquid at 80°C.

Pexgol Pipes

Pexgol 335 mm, Class 10.

Application

Discharge line.

Lenght

350 m.

Categories

Slurry Transportation

The Challenge

Moa Nickel required to transport highly abrasive liquid at high temperatures.

At the beginning they used fibre-reinforced plastic pipes, that later suffered damage caused by the abrasion. Furthermore, they used polypropylene pipes that didn’t work either, they couldn’t resist neither the abrasion nor the high temperatures.

The former pipes were short combined sections that required reinforced foundations and were very hard to install. The working periods were short because of the constant failures, furthermore, the maintenance cost was high as well.

Pexgol Solution

Once the client evaluated the operative conditions, they decided that Pexgol pipes were the best option, thanks to it abrasion resistance.

Additionally, special “U” pieces were developed for the client, made of steel with internal Pex lined.

After the installation, the Pexgol pipes operates perfectly till today, in excellent conditions and reducing head losses.

Related Case Studies

Pvc Pipe Replacement by Pexgol

Transportation of sodium sulfide

Magnelec S.A. de C.V.
Mexico

 | 

2018
The Original Design for a Wastewater Treatment Plant included Stainless Steel Pipes, but after discovering the Superior Capabilities of Pexgol Pipes, the Entire Facility was Switched Over.

New Wastewater Treatment Plant with Pexgol Pipes

Wastewater Treatment Plant
Israel

 | 

2022
Installation of Buried Pipes to Transport Water on a Mining Road.

Water Transportation on a Mining Road

CODELCO – Andina Mine
Chile

 | 

2019
Installation of 1000 Meters of PE-X Pipe for an Underground Mine.

Mining Drainage Lines

Lundin Mining – Alcaparosa Mine
Chile

 | 

2019
Installation of Pexgol Pipesf for the Drainage of an Underground Mine.

High Pressure Drain in Underground Mine

Ojos del Salado Mine – Lundin Mining
Chile

 | 

2018
Sewage Water Transportation with 300 PPM Hydrogen Peroxide

Sewage Water Transportation

BorsodChem
Hungary

 | 

2011