Recovered Water Transportation
Grey Water Transportation
Case Study Nº
38
Customer
Coeur Mexicana S.A. de C.V. Palmarejo
Mexico
|
2017
Working Conditions
74 psi, altitude dierence= 34 m, Au= 0.12 ppm, Ag= 0.18 ppm, Cu= 1.13 ppm, Fe= 0.73 ppm, Cn total= 1.5 ppm, Ca= 458 mg/dL, Ph= 8
Pexgol Pipes
Pexgol SDR 15 225 x 20.4.
Application
Water transportation.
Lenght
1200 meters.
Categories
The Challenge
Coeur Mexicana required to transport recovered water, but they wanted to conduct an installation in the minimum time possible that won’t require contractors, specialized personnel neither expensive equipment.
Pexgol Solution
The client decided to install Pexgol, due to it quick and easy installation, that if was carried out with steel or HDPE pipes, it would require 100 joints. But, since it was done with Pexgol pipes it only took 4 joints.
Furthermore, it was considered the security that Pexgol pipes offer, since it’s supplied in long length coils, which reduces leakages.
Pexgol’s team advised the client during the whole process from the design to the installation.
Related Case Studies
Potable Water Supply on Harsh Terrain
Mekorot / Beit Shemesh Water Company
Israel
|
2017
Transport of Muddy Water for Palm Oil Extractor
Extractora Poligrow
Colombia
|
2022
Pexgol Pipes for Efficient Wastewater Transport
Paladini
Argentina
|
2022
Open Cast Mine Dewatering
Agnico Eagle Pinos Altos Mine
Mexico
|
2017