Potable Water Supply on Harsh Terrain

Case Study Nº

48

Customer

Mekorot / Beit Shemesh Water Company
Israel

|

2017

Working Conditions

High pressure (12 bar), possible water hammers & complicate terrain.

Pexgol Pipes

Pexgol 630 mm, Class 15

Application

Drinking Water Transportation

Lenght

1.3 km

Categories

Potable Water Supply on Harsh Terrain

The Challenge

The Municipal Water Company of Beit Shemesh (Israel) in cooperation with the Ministry of Construction and Housing of Israel required to install a main potable water supply line from Mekorot to the city of Beit Shemesh. The line brought high pressure water from Mekorot, and goes along a national route to a reservoir that supplies drinking water to thousands of housing units in the developing Ramat Beit Shemesh area.

The line connecting the Mekorot station to the water reservoir runs along a very complex rocky road characterized by many twists and turns, within a forested path protected by the authorities, at altitudes close to 100 meters, and ancient areas that are forbidden to be excavated.

To implement the project, it was required a pipeline that could cope with a combination of high pressures, a very dynamic pressure regime and to be suitable for transportation and installation under very aggressive conditions.

In addition, the pipe line needed to be anti-static and / or a pipe made of insulating material that would be impervious to electric shocks since a parallel pipe line was placed with power lines.

Pexgol Solution

The outstanding capabilities of Pexgol pipes led to the selection of this reliable system for the installation.

To meet the strictest standards in terms of quality, safety and preservation of the environment a Pexgol pipe line of 1.3 km was installed. The installation was done 15 meters underground in a very harsh environment that required constant dragging of the pipe.

The natural bending radius of the pipes were key to the success of this project. Furthermore, the line was capable of supporting water hammers caused by the pumping from the Water Company.

Additionally a 200 meters section was installed by horizontal drilling inside an existing steel pipe line. The Pexgol pipe section for this part was cover with plastic spacers to separate it from the current pipe.

Overall the installation took 20 days without any special equipment. With other pipe materials such as PE, it could take 3 or 4 times more since extreme precautions needed to be done to avoid damaging the pipes and connecting between sections on this harsh terrain.

Related Case Studies

The impact of Pexgol piping on pump performance improvement and maintenance cost reduction at Sales de Jujuy.

Improvement in Brine Management through Pexgol Piping

Sales de Jujuy
Argentina

 | 

2023
Transport of high corrosive material from the thickeners to the neutralization plant

Corrosive Material Transportation

Moa Nickel S.A. Sherritt
Cuba

 | 

2015
Biodiesel Transport through the Colombian Jungle

Biodiesel Transport

Indupalma (Oro Rojo Plant)
Colombia

 | 

2012
Installation of Pexgol Pipes in a Fish Processing Plant.

Fish Oil Transport at 36°C / 96.8°F

Guaymas Protein Company
Mexico

 | 

2018
Cement Slurry Injection to an Underground Mine

Backfill

Aguilar Mine
Argentina

 | 

2015
Installation of 3000 Meters Of PE-X Pipe for an Underground Mine.

Drainage Lines in Underground Mine

Lundin Mining – Candelaria Norte Mine
Chile

 | 

2020