Open Cast Mine Dewatering
Dewatering without Supports
Case Study Nº
37
Customer
El Volcan Mine Arcelor Mittal
Mexico
|
2017
Working Conditions
Pressure 189 psi; height difference 130 m; solids 15-20 %; fluid temperature 20-25°C.
Pexgol Pipes
Pexgol Class 15 160 x 14.6.
Application
Dewatering
Lenght
650 meters.
Categories

The Challenge
El Volcan Mine was facing a excess water that required dewatering. During rainy season the Mine area suffers from constant floods due to high level groundwater that wasn’t taken under consideration.
In addition, the client was looking for a quick and easy to install solution, since the pipe was going to be suspended, and a regular pipe will require supports.
Pexgol Solution
El Volcan Mine decided to replace their current 6” RD11 HDPE pipe for a Pexgol class 15 pipe 160 x 14.6 due to it quick and easy installation.
650 meters of Pexgol pipe was provided. The installation was done in a quick and efficient way, and count with Pexgol technical support during the whole process.
Related Case Studies
Transportation of Water with Solids
Kofanor
Mexico
|
2022
Syncrude & Pexgol: A Collaboration Set to Reshape Slurry Transport
Syncrude
Canada
|
2022
Potable Water Aqueduct
Acueducto y Alcantarillado de Bogotá
Colombia
|
2019
Meltdown Water Transport
Codelco Andina, TADA 1-2 Project
Chile
|
2013
Alumina Plant: Ore Slurry Transportation
Urals Alumina Plant – Rusal
Russia
|
2013