Open Cast Mine Dewatering
Dewatering without Supports
Case Study Nº
37
Customer
El Volcan Mine Arcelor Mittal
Mexico
|
2017
Working Conditions
Pressure 189 psi; height difference 130 m; solids 15-20 %; fluid temperature 20-25°C.
Pexgol Pipes
Pexgol Class 15 160 x 14.6.
Application
Dewatering
Lenght
650 meters.
Categories
The Challenge
El Volcan Mine was facing a excess water that required dewatering. During rainy season the Mine area suffers from constant floods due to high level groundwater that wasn’t taken under consideration.
In addition, the client was looking for a quick and easy to install solution, since the pipe was going to be suspended, and a regular pipe will require supports.
Pexgol Solution
El Volcan Mine decided to replace their current 6” RD11 HDPE pipe for a Pexgol class 15 pipe 160 x 14.6 due to it quick and easy installation.
650 meters of Pexgol pipe was provided. The installation was done in a quick and efficient way, and count with Pexgol technical support during the whole process.
Related Case Studies
Transportation of sodium sulfide
Magnelec S.A. de C.V.
Mexico
|
2018
Pexgol for Centrifugal Pump Test
Flowserve
Argentina
|
2022
Dewatering at an Open Cast Mine
Codelco, Ministro Hales Division
Chile
|
2016
High Pressure Drain in Underground Mine
Ojos del Salado Mine – Lundin Mining
Chile
|
2018
Slurry: Pexgol’s Superior Alternative to Traditional Piping
Chip Manufacturer
USA
|
2022
Syncrude & Pexgol: A Collaboration Set to Reshape Slurry Transport
Syncrude
Canada
|
2022